Connecting the mains supply
Electrical safety of the appliance is only guaranteed by correct grounding,
in compliance with the applicable laws and regulations.
Connect the boiler to a 230V mon ground power supply by
means of the three-pin cable supplied with it and make sure you connect
polarities correctly.
Use a double-pole switch with a contact separation of at least 3mm in
both poles.
In case you replace the power supply cable fit a HAR H05 VV-F’
3x0.75mm
2
cable with an 8mm diameter max.
…access to the power supply terminal block
•
isolate the electrical supply to the boiler by the double-pole switch;
•
unscrew the two screws securing the control board to the boiler;
•
rotate the control board;
•
unscrew the screw securing the lid and gain access to the wiring (Fi-
gure 8).
A 2A fast-blowing fuse is in-
corporated in the power supply
terminal block (to check or replace
the fuse, pull out the black fuse
carrier).
(L) =
Live brown
(N) =
Neutral blue
( ) =
Ground yellow/green
(1) (2) = room thermostat
terminal
Figure 8
0010172100
Fitting a room thermostat
•
gain access to the power supply terminal block (Figu-
re 9) as described in the previous section;
•
remove the jumper placed on terminals (1) and (2);
•
insert the duplex cable through the core hitch and
connect it to the two terminals.
Connecting a programming clock
•
remove the two screws securing the control board to the boiler and
hinge it downward;
•
remove the 2 screws fixing the control board cover and hinge it
upward;
•
connect the programming clock motor to the main PCB M3 connector
(terminals 18 and 20);
•
connect the programming clock switch to the M3 connector terminals
(17 and 19) and remove the jumper.
In case you are fitting a battery-operated programming clock do not
connect the M3 connector terminals (18 and 20).