![Potterton Paramount 40 Скачать руководство пользователя страница 94](http://html.mh-extra.com/html/potterton/paramount-40/paramount-40_installation-manual_1583071094.webp)
Note
: These are calculated values. The actual output must be calculated using a
gas meter, for example.
Fan output DHW max.
(2444)
With this parameter the maximum boiler capacity for the DHW mode can be re-
stricted.
Note
: These are calculated values. The actual output must be calculated using a
gas meter, for example.
Fan shutdown heating mode
(2445)
This function is used for switching off the supply voltage for the fan. The supply
voltage for the fad is released as soon as the fan PWM actuation is active or a
DHW request exists. The switch off is done delayed to switch off of the PWM ac-
tuation or to discontinuation of the DHW request. The duration of the switch off
delay can be set with the fan switch off delay function (prog.no. 2446). During a
DHW request the voltage supply for the fan also remains then released if the
PWM actuation is not active.
Fan shutdown delay
(2446)
If no heating requirement exists the voltage supply of the fan is switched off. The
time is set here in which the fan gets voltage anyway.
Controller delay
(2450)
The controller delay is used for a stabilisation of the combustion conditions, espe-
cially after a cold start. After release of the firing automation by the controller
this remains on the set output for a specified time. Only after this time has
elapsed is the modulation released.
Prog. no. 2450 is used to set at which operating mode the controller delay is ac-
tive.
Controller delay fan output
(2452)
Boiler capacity which is used during the duration of the control delay.
Note
: The calculated value see prog-no. 2444.
Controller delay duration
(2453)
Duration of the control delay. The time duration starts as soon as after ignition a
positive flame detection is done.
Programming
94
Paramount three 30-115 kW
7308272-03 03.14
Содержание Paramount 40
Страница 1: ...Installation manual Gas condensing boiler Paramount three 30 115 kW ...
Страница 23: ...Prior to installation 7308272 03 03 14 Paramount three 30 115 kW 23 ...
Страница 25: ...Fig 5 Connection plan Prior to installation 7308272 03 03 14 Paramount three 30 115 kW 25 ...
Страница 28: ...4 9 Legend Prior to installation 28 Paramount three 30 115 kW 7308272 03 03 14 ...