background image

9

DimStation Quickstart

15  Tighten head bolts

Tighten the bolts that attach the 
head to the shroud.

14  Reattach shroud cover

Put the top back on the shroud 
cover. Slide it forward until it 
clicks into place, then re-tighten 
the fours screws that secure it.

13  Align the head

Gently folding the cables into 
the cable shroud, insert the 
bolts on the head into the 
keyhole slots on the shroud. 

Do not tighten them yet. 

Содержание QubeVu DimStation

Страница 1: ...QubeVuQuickStart DimStationassembly andsetup...

Страница 2: ...2 WelcometoQubeVuDimStation theInstantDimensionInvention Thisguidewillassistyouin assemblingandsettingup yournewDimStation 15 minutes...

Страница 3: ...3 DimStationQuickstart Display Head Calibration box Ethernet cable Base Hex wrenches Power cord Pole 1 Inventory Carefullyunpackand familiarizeyourselfwith everythinginthebox...

Страница 4: ...vetheothertwo screwsinplace 3 Assemblepole Takingcarenottostrainthe cables laythepoleoutonthe floor preferablyonarugor similarsoftsurface Insertthe lowerhalfofthepoleintothe upperhalf 4 Connectpolehal...

Страница 5: ...armsofachairforthisstep Removethefourboltsthatare pre installedintheblockatthe bottomofthepole 6 Attachbase Withthepowerblockhanging offtheedgeofthetable insert thetwopinsinthebaseintothe matchinghol...

Страница 6: ...6 Display cable Base Power block Cable shroud 7 Completepole Standthecomplete assembled poleupright Tomaketherestofthe assemblyprocessassimpleas possible reviewthenamesof theDimStation spartsatleft...

Страница 7: ...Loosenthefourboltsthat securethetopofthecable shroud Donotremovethem Slidetheshroudcoverbackand liftitoff Setitaside 9 Beginattachmentofhead Aligntheheadwiththecable shroudatthetopofthepole Itmayhelpt...

Страница 8: ...eportsonthebackofthe headarealsolabeled 12 Attachcables Usethisguidetocorrectly connectcablestotheirports in thelistedorder Order Cable label Port label 1 Ethernet Ethernet 2 USB 3 USB 3 3 USB 2 USB 2...

Страница 9: ...theshroud 14 Reattachshroudcover Putthetopbackontheshroud cover Slideitforwarduntilit clicksintoplace thenre tighten thefoursscrewsthatsecureit 13 Alignthehead Gentlyfoldingthecablesinto thecableshrou...

Страница 10: ...he bottomcorneronthebackof thedisplay Youwon tneedthisagain 18 Choosedisplaylocation Thedisplayisusuallymounted justabovethedisplaycable opening It spossibletomountthe displayupto6inchesaboveor belowt...

Страница 11: ...displaytothepole atyourchosenlocationby re tighteningtheboltonthe U shapedbracket 20 Connectthedisplaycable Attachthedisplaycabletothe mini USBportlocatedwhere youremovedthecablecoverin apreviousstep...

Страница 12: ...DimStation sbase Centerit fromsidetoside Tolocateyourscalefront to back findthesmallgroove engravedonbothedgesof thebase Usethisasthe front to backcenteringpoint foryourscale 20 Attachthepowercable At...

Страница 13: ...mStationQuickstart YourDimStationisnowready tobepluggedin Whenitis the softwaresetupprocesswill beginautomatically Don tpluginyourDimStation unlessyouhaveafewminutesto completeallofthesetupsteps 5 min...

Страница 14: ...Touchthearrow buttontobeginsetup 2 AccepttheUserAgreement ReviewtheEndUserLicense Agreement EULA byusingthe upanddownscrollbuttonson therighthandside Touchthethumbsupbutton toconfirmyouhavereadand ac...

Страница 15: ...15 DimStationQuickstart 3 Setyourtimezone Selectyourtimezone and thentouchthecheckmarkto continue 4 Adjustthedateandtime Adjustthedateandtimeif necessary andthentouchthe checkmarktocontinue...

Страница 16: ...even Ifyourbaseisasmooth topped scaleortheDimStationbase touchtheleftbutton Ifyourbaseisascalewithan unevensurface suchasrollers touchtherightbutton 6 ZeroHeight Unevensurface Ifyouhaveasmooth topped...

Страница 17: ...kstart 7 ZeroHeightcontinued Itisimportanttokeep DimStation sbaseclearand unobstructedduringzero heightcalibration sothatitcan setZeroHeightaccurately 8 ZeroHeightcontinued Pleasestandclearbeforethe c...

Страница 18: ...kmarkto continue 10 SettheScanZone TheScanZoneistheareain whichDimStationlooksfor anddimensionsitems For bestperformance adjustthis tocoverthelargestarea possiblethatcanbeusedfor scanningitemsandkeptc...

Страница 19: ...tobegin usingyourQubeVuDimStation 12 Confirmcalibration TestwhetheryourDimStation isproperlycalibratedbyplacing thecalibrationobjectonthe baseorscaleandcheckingthe displayeddimensions Dimensionsshould...

Страница 20: ...erremoveQubeVu shead cover ortheelectricalconnection panelsatthebaseofthepole assembly Nevermodifyorattemptto repairyourunit Servicemust beperformedonlybyPostea personnel Handlecablesandcable connecto...

Страница 21: ...omanyavailable DHCPserver However italsohasafixed fail safeIPaddressof169 254 1 1 IfyourprefertouseDHCP your networkadministratorcanadviseyouastotheIPaddressleasedbyQubeVu Configure PC network setting...

Страница 22: ...anotherinnovationby 222ThirdStreet Cambridge MA02142USA www postea com 2015PosteaInc Allrightsreserved QubeVuandDimStationareregisteredtrademarksofPostea...

Отзывы: