EUDA2 Series 12”/15”/18.5” Panel PC User’s Manual (ver2.1) 30
AC/DC Power adaptor installation (Optional)
1. Screw 3 pin terminal block cable to adaptor
2. Connect 3-pin terminal block connector to PPC
through AC in with adaptor
Fig.6-11: AC/DC 12V/60W adapter supplied with the EUDA2-S1821
6.2 Panel & VESA Mounting
6.2.1 Panel Mounting (EUDA2-S1821 only)
The 18.5” EUDA2 Panel PC, EUDA2-S1821, configurations in the delivering status with mounted mounting
clamps (Fig. 6-12, depending on the ordered size). These mounting clamps have to be removed at first in order
to install the system into a sub-frame or a panel. Loosen the screws enough to allow the removing of the
mounting clamps from the enclosure (but do not entirely remove the screws from clamps).
First of all, check the wall thickness and the cut-out dimension, then insert the mounting kit step by step as the
following illustration.
Fig. 6-12: cut-out definition
(mm)
A
B
C
D
Mounting Kits
EUDA2-S1821
< 9
53.7
452
277
16
Table 6-1: Cut-out Dimension by Panel size
Insert panel mounting kit into panel mounting hole
Screw it to fix on steel wall
Screw the Clip tightly (Spec
<=
1.35 N )
Hook the mounting clamps with screws (included)
from the rear side of the panel
Fig. 6-13 : Mounting kit installation guide step by step