background image

pg. 4

 

   

 

3/

   

   

 

5/

   

CONNECTIONS TO FLOWMETER - OPERATING INSTRUCTIONS

 

Flowmeter Gas Supply Tubing is connected  to the Outlet Station via a quick  connect  coupler.   The Porter 8060 series duplex connec-

 

tor  simultaneously connects  the Oxygen and Nitrous oxide tubing, and prevents the Nitrous Oxide from being connected  unless the

 

Oxygen is connected.

 

 

Quick Connecting: 

You may quick connect  to the station when the system pressure is at its normal 50 PSI; the primary check 

valves seal this  pressure.  The coupler  has a locating latch.  Simply insert the coupler into the appropriate  check valve and confirm the 
latch

 

is in place behind the catch feature of the valve.  A gentle tug on the coupler  will confirm  a stable latch position.   Internally, within the 
primary check valve, an o-ring  seals against a poppet.   The same o-ring seals against the quick connect  extensions upon insertion. 
Slide the latch out of position to remove the connector  and the internal poppet  will automatically move back into its sealing position.

 

 

Resuscitator:  

Remove the duplex connector  so a resuscitator quick connect  may be inserted into the oxygen station position.

 

 

MAINTENANCE AND SERVICE

 

Use scavenging. 

Monitor for N

2

O in the operatory to insure that controls  are effective in achieving low levels of ppm  (parts per

 

million) exposure.  Contact  your Porter dealer for details on monitors  and testing.

 

 

Inspect and maintain 

the analgesia delivery system to prevent N

2

O leaks in all hoses, connections  and fittings.   Repair all leaks 

immediately.

 

 

MONTHLY  CHECK

 

Leak  test the entire system for working pressure leaks.  

Connect an 8060 series duplex connector and hoses into the Outlet

 

Station.   Attach the other end of the hoses to a flowmeter and turn the flow control knobs to the off position and the on/off  switch 
to the off position.

 

 

Pressurize the sedation gas supply  lines with  50 PSI.  Observe any pressure decay after 12 hours.  This 50 PSI test with the flowmeter 
tubing connections in place tests the seal of  the duplex  connector  extended  into the o-rings of the outlet station primary check valves. 
(5 PSI drop  allowed.)

 

6200-1 CUT-OUT

 

 
 
 
 
 
 
 
 
 

FACEPLATE      

OUTLINE

 

 
 

 

CUT-OUT IN WALL

 

 

 

3  8”

 

2  8”

 

 

 
 
 
 
 
 

2 1/4” DEPTH MIN

 

 
 
 
 
 
 
 
 

 

 

3 7/8”

 

 

4 5/8”

 

 

Отзывы: