8 0 0 0 1 4 - 1 0 0 R e v . A
- 3 -
INSTALLING THE LUTEZIA TOP (04268) /
POMEZIA TOP (04168)
Two people recommended for this installation
Install faucet and drain in accordance with
manufacturer's instructions. Be certain to apply a
bead of sealing putty on the underside of the drain
(Part "A") in order to ensure a watertight seal between
the sink and drain. Remove excess putty after
installing the drain on the sink.
Apply a 1/8" bead of silicone adhesive to the rim of
the vanity as shown.
Place the Lutezia/Pomezia top centered left to right on
the vanity and with the back edge of the top even with
the rear of the vanity. Clean up any excess silicone.
After top is replaced, connect the trap to the drain
assembly hand tight to check alignment. It may be
necessary to cut off part of the tailpiece (area "B") or
part horizontal leg of the trap (area "C").
Connect hot and cold supply lines to the shut off
valves. Tighten trap joints for watertight assembly.
A
B
C