8 0 0 0 1 4 - 1 0 0 R e v . A
- 2 -
C/L of 2 x 6
Reinforcement
Finished
Floor
*
Suitable reinforcement is required for anchoring the
vanity to the wall. Determine horizontal centerline
location " " of support from fixture. (see Figure 1)
If molding is present, either notch the molding to
seat the vanity flush against the wall or provide
suitable spacer. (see Figure 2)
Rough in supply lines and waste per rough in
dimensions.
NOTE:
If current supply lines are greater than 6"
on center, they may interfere with cutout in rear of
vanity or vanity shelf.
Move the vanity into place and anchor it to the wall
through at least 2 of the mounting holes in the rear
of the vanity. The glides can be adjusted outward
up to 3/4" but it is recommended not to exceed 1/2"
if possible.
Continue with installation appropriate for top and
sink options chosen.
VANITY INSTALLATION
MOLDING
SPACER
FIGURE 1
FIGURE 2
C/L
18-1/4"
(464mm)
*
ADJUSTABLE GLIDES
(LOCATED UNDER EACH FOOT)