
18
5. OPERATING THE PUMP
5.Use the “+” and “-” arrows to adjust the daily start time for SPEED 1.
6.Press the “1” button again and the display will change to SPEED 1 duration. The
“Duration” parameter LED will begin to blink. See
Figure 9
.
7. Use the
“+”
and
“-”
arrows to adjust the duration for SPEED 1 in hours and minutes.
NOTE: The duration parameter is adjusted in 15 minute increments.
8.Pressing the
“1”
button will continue to cycle through these parameters, but the
changes are immediately saved as they are adjusted.
9.Press the
“2”
button. The LED above SPEED 2 will begin to flash and the corresponding
parameter LED will flash while editing.
10.Use the
“+”
and
“-”
arrows to adjust the speed in RPM for SPEED 2.
11.Press the
“2”
button again and the display will change to SPEED 2 duration.
Note: SPEEDs 2 and 3 do not have a start time, as they begin their duration
immediately after the previous SPEED finishes.
12.Use the
“+”
and
“-”
arrows to adjust the duration for SPEED 2 in hours and minutes.
13.Repeat steps 9-12 to program SPEED 3-4 and QUICK CLEAN.
Note: Remember that the duration allowed for SPEED 3 will be limited to the remaining
time in a 24 hour day. Any time in the 24 hour day not programmed into SPEEDs 1-4,
the pump will remain in a stationary state.
[ SPEED 1 + SPEED 2 + SPEED 3 +SPEED 4< 24 Hours ]
14.Press the
Start/Stop
button and ensure the LED is lit. The pump is now on and will
run the custom user-programmed schedule.
NOTE: If the pump has been stopped via the
Start/Stop
button, the pump will not run
until the pump is turned back on by the
Start/Stop
button. If the
Start/Stop
LED is
illuminated then the pump is on and will run the programmed schedule.
Figure 9: Setting Duration