Pompetravaini TRSK 2002/1 Скачать руководство пользователя страница 11

Operating manual liquid ring vacuum pumps TRVK - TRSK 

11 

6 - STORAGE INSTRUCTIONS 

 

After receipt and inspection, if not immediately installed, the unit must be repackaged and stored. 
For a proper storage proceed as follows: 
-  store the pump in a location that is closed, clean, dry and free of vibrations 
-  do not store in areas with less than 5°C temperature (for lower temperature it is necessary to completely drain the 

pump of any liquids that are subject to freezing) 

 

 

FREEZING DANGER! 

Where the ambient temperature is less than 5°C it is recommended to drain the pump, piping, separator, 
heat exchanger, etc. or add an anti-freeze solution to prevent damage to the equipment. 

 

-  fill the pump with a rust-preventative liquid that is compatible with the pump gaskets and elastomers. Rotate the 

shaft by hand to impregnate all internal surfaces. Drain the excessive liquid from the pump and associated piping 
(see chapter 11). 
Please note that the pumps with cast iron internal parts have been treated at the factory, prior to shipment, with a 
rust-preventative liquid: this liquid is capable of protecting the pump against rust for a period of 3 to 6 months. 
A further solution, for long term storage, is to fill the pump with the rust inhibitor, rotate the pump shaft by hand to 
eliminate any air pockets (the liquid must be suitable with gasket, elastomers and pump materials). 

-  plug all openings that connect the pump internals to the atmosphere 
-  protect all machined surfaces with an anti-rust material (grease, oils, etc.) 
-  cover the unit with plastic sheet or similar protective material 
-  rotate pump shaft at least every three months to avoid possible rust build-up or seizing 
-  pump accessories should be subjected to similar procedure. 
 
 
 
 

7 - MOUNTING AND ALIGNMENT INSTRUCTIONS 

 

7.1 - ASSEMBLY OF BASE MOUNTED PUMP UNIT 

If the pump has been purchased with free shaft end, a proper baseplate is required to mount the pump/motor assembly. 
The baseplate must be properly designed for maximum rigidity to prevent vibrations and distortions. It is recommended 
the use of a fabricated baseplate manufactured with rigid “U” shaped channel (fig. 16 illustrates an example). 
When  the  pump  has  been  purchased  without  the  electric  motor,  it  is  then  required  to  select  the  proper  motor  before 
proceeding to the installation of the unit. Selection of motor must consider the following: 
-  maximum power absorbed by the pump over the total operating range 
-  pump operating speed (RPM) 
-  available power (Hertz, voltage, etc.) 
-  motor enclosure type (CVE, AD-PE, ODP, TEFC, EX.PR., etc.) 
-  motor mount (B3, B5, horizontal, vertical, C-flange, D-flange, etc.). 
 
Flexible couplings are selected considering: 
-  nominal motor horsepower 
-  motor operating speed 
-  coupling guard must meet safety standards as dictated by EN 294, OSHA, etc. 
Flexible  couplings  must  be  properly  aligned.  Bad  alignments  will  result  in  coupling  failures  and  damage  to  pump  and 
motor bearings. 
 
Assembly instructions for MONOBLOCK design are listed on paragraph 7.3 steps 1, 2, 4, 5, 6. 
Assembly instructions for PUMP-MOTOR ON BASEPLATE are listed on paragraph 7.3 steps 7, 1, 8, 5, 9, 10, 11. 
For the belt drive alignment procedures follow instructions in paragraph 7.4. 
 

7.2 - ALIGNMENT PROCEDURES FOR MONOBLOCK AND FOR PUMP/MOTOR ASSEMBLY ON BASEPLATE. 

The pump/motor assembly is properly aligned by POMPETRAVAINI prior to shipment. 
It is however required to verify the alignment prior to the start-up. Misalignment can occur during handling, transportation, 
grouting of assembly, etc. 
For alignment procedures of MONOBLOCK design see paragraph 7.3 steps 3, 4, 5, 6. 
For alignment procedure of BASEPLATE design see paragraph 7.3 steps 7, 5, 9, 10, 11. 
 

PLEASE NOTE

:  Coupling sizes and permissible coupling tolerances listed in this manual are applicable to the particular 

coupling brand installed by POMPETRAVAINI as a standard. For sizes and tolerances of other type 
of couplings, follow the instructions given by their respective manufacturer. 

 

7.3 - ALIGNMENT INSTRUCTIONS 

NOTICE: 

Alignment  should  be  done  at  ambient  temperature,  obviously  with  power  to  the  motor  disconnected  and 
following the safety procedures to avoid accidental starting (see chapter 2). 

 

Содержание TRSK 2002/1

Страница 1: ... NA4 IS VUOC IN00 Rev 3 8_11 2020 OPERATING MANUAL LIQUID RING VACUUM PUMPS TRVK TRSK ...

Страница 2: ...led with an electrical motor of Pompetravaini supply or customer supply placed on the market after the 15th of August 2018 fell within the limits of application of the Directive As a consequence conforming to article 14 of the 2012 19 UE Directive of the European Parliament of the 4th of July 2012 Pompetravaini Spa is registered on the Italian list of EEE manufacturer The electrical pump assembly ...

Страница 3: ... 9 3 3 Service liquid Total recovery system 9 4 Pump engineering data 10 Check list prior to start up 11 Starting operating and stopping procedures 11 1 Start up 11 2 Operation 11 3 Shut down 12 Operating maintenance 13 Bearings mechanical seals and packed stuffing boxes maintenance 13 1 Bearings 13 2 Mechanical seals 13 3 Packed stuffing boxes 13 3 3 Adjustment of the packing 13 3 2 Replacement o...

Страница 4: ...gs contact POMPETRAVAINI or the authorised local representative 1 2 READING THE INFORMATIONS MARKED ON PUMP S NAMEPLATES AND SERVICE CARDS The machinery Directive 2006 42 EC and the ATEX Directive 2014 34 EU require the marking of certain information on the pump s nameplates The pump nameplate must be applied so that it is not easily removable and remains legible for long time Furthermore accordin...

Страница 5: ...o a use in a Zone classified for Dust There could be another string for example for the Technical File 8TCx19R006 if necessary There are also symbols identifying some particularities of the pumps and systems The EC symbol identify a product subject to the Machinery Directive 2006 42 CE The trash bin symbol identify a product subject to the WEEE Directive 2012 19 EU The symbol EX identify a pump th...

Страница 6: ...sessing that all other equipment and accessories supplied and included in the bill of material are compliant with CE and ATEX requirements and guarantee a degree of protection equal to or higher than that of the pump they are coupled to Each device instrument or accessory has been selected and assembled by Pompetravaini according to the manufacturer s instructions and so as not to compromise its c...

Страница 7: ...ed to the pump must NEVER be under pressure or vacuum when maintenance or repair is carried out NOTE There are materials in the pump that may be hazardous to people suffering from allergies Maintenance and operating personnel should consult the tab 1 for such materials Take care of their eventual disposal according to the laws into force and to a safe local environment management Tab 1 MATERIAL US...

Страница 8: ...centrifugal force assumes the shape of the impeller casing The progressive change of volume between the 2 vanes the impeller hub and the liquid ring first creates a vacuum and then a compression of the gas in the B C area till the gas is discharged together with a portion of the liquid through the discharge port C D The lost liquid must then be replenished 4 2 SERVICE LIQUID PROPERTIES For a good ...

Страница 9: ... department Take immediate actions to dispose of eventual packaging parts that may generate injuries or risks for example edges nails splinters etc and of materials subjected to controlled and differentiate disposal for example plastic cartoon polystyrene materials etc according to the laws into force and to a safe local environment management according to the laws into force and to a safe local e...

Страница 10: ...Operating manual liquid ring vacuum pumps TRVK TRSK 10 90 OK NO Fig 2 Fig 4 Fig 1 Fig 3 ...

Страница 11: ...ximum rigidity to prevent vibrations and distortions It is recommended the use of a fabricated baseplate manufactured with rigid U shaped channel fig 16 illustrates an example When the pump has been purchased without the electric motor it is then required to select the proper motor before proceeding to the installation of the unit Selection of motor must consider the following maximum power absorb...

Страница 12: ...sert the perforated metal sheet coupling guard inside the lantern so that the coupling is accessible from one of the lateral openings Couple the electric motor to the pump lantern engaging the two coupling halves hands may reach the coupling halves through the lateral opening see fig 7 tighten the assembly with bolts supplied with the unit and install the supporting foot when applicable see fig 6 ...

Страница 13: ...late and bring the two coupling halves together with approx 2 mm gap between them keeping the motor axially aligned with the pump shaft In the event the two shaft heights do not align proper shimming under the pump or motor feet will be required Mark the motor and or pump anchoring bolt holes Remove motor and or pump drill and tap the holes clean and mount pump and or motor in place and lightly ti...

Страница 14: ...the guard should not be greater than 2 to 3 mm see fig 15 2 to 3 mm Fig 15 7 4 BELT DRIVE ALIGNMENT PROCEDURE If the pump is fitted with belt drive it is necessary to verify the tension of the belts at the first start up and periodically at least every 6 months as described see figure 16 Disconnect the electrical power from the motor of the pump with the PUMP STOPPED remove the guard from the pull...

Страница 15: ...hich are supplied with the pump or systems must be connected and handled in accordance with the instructions supplied by their respective manufacturers When the pump is coupled on baseframe carry out the ground connection also for the baseframe on the preposed position with screw or through hole marked by the ground connection symbol Remove a portion of the paint on the connection point to ensure ...

Страница 16: ... B The pump series TRVK TRSK are supplied with a discharge manifold capable of separating gas from the service liquid If it is desired to implement separation in a separate tank it is necessary to close the service liquid discharge connection located at the manifold 9 2 ACCESSORIES Listed below are common accessories that may be supplied with the pump or added at a later date Non return valve chec...

Страница 17: ...upplied at the pump connection with a pressure of 0 2 to 0 4 bar maximum to avoid flooding the pump with too much liquid If this is not possible it is recommended to install a reservoir fitted with a float valve this tank is supplied with the liquid that is then pulled by the pump as required by the operating conditions The liquid level in the reservoir should be approximately at the pump shaft ce...

Страница 18: ... to from to TRVK 1502 1 850 565 880 30 55 200L 250M 260 410 TRVK 1503 1 1043 590 920 45 90 225M 280M 320 650 TRVK 2003 1 705 500 740 55 110 250M 315S 410 1000 TRVK 2503 1 790 370 660 75 160 280S 315L 550 1160 TRVK 3003 1 1060 370 530 132 250 315M 355M 1100 1700 TRVK 3503 1 1005 270 470 160 315 315L 355L 1160 1850 TRVK 4003 1 1130 240 400 200 500 315L 450 1270 3020 TRVK 5003 1 1295 210 330 315 630 ...

Страница 19: ... first start up and before every start up if pump or motor has been removed from the installation for maintenance or other reasons see chapter 7 2 Prior to starting the pump verify that all auxiliary components are available ready for use and where required they are in the open position i e double mechanical seals are pressurised with buffer liquid cooling liquid to heat exchanger is open etc and ...

Страница 20: ...is consistently handling the application for which it was selected The operation of the pump should be without abnormal vibrations or noises if any of these problems is noticed the pump should be stopped immediately search for the cause and make the necessary corrections It is good practice to check the pump motor alignment the running conditions of the bearings and of the mechanical seals see cha...

Страница 21: ...em Systems that handle condensable will experience a rise in the level of the service liquid in the separator The excessive liquid will be overflowed through the overflow valve or connection 13 BEARINGS AND MECHANICAL SEALS MAINTENANCE WARNING The maintenance must be carried out with the pump turned off and the electrical power or other driving mechanism must be disconnected The power should only ...

Страница 22: ...or special constructions contact Pompetravaini 13 3 PACKED STUFFING BOXES Pumps fitted with packed stuffing boxes require packing flushing either from an external source or directly from the pumped media through pump internal passages This liquid is necessary to remove the friction heat generated between the shaft and the packing For the exact locations and dimensions of the flushing connections s...

Страница 23: ...stablish a steady dripping at low temperatures Packing adjustment is required when the liquid leakage increases When adjustment is no longer possible the packing material should be replaced with new one see following chapter In the event the pump remains out of service for more than 6 months it is recommended to replace the packing rings prior to start up 13 3 2 REPLACEMENT OF THE PACKING RINGS Th...

Страница 24: ...alve to a lower vacuum 8 High service liquid flow Reduce the service liquid flow adjust the by pass valve 9 High back pressure Check the discharge line for obstructions or high friction losses reduce the back pressure to maximum 0 1 bar 10 Wrong pump motor assembly Verify that the base surface is level and that all pump feet are resting on the surface add spacers if required 11 Mechanical seal fai...

Страница 25: ...on Avoid damaging other system components After pump repairs re install following the steps from Assembly and Alignment procedures and after see the applicable chapters 16 SPARE PARTS When ordering the pump it is good practice to also order the necessary spare parts especially when there are no stand by pumps in the installation This will minimise unnecessary down times in the event of pump failur...

Страница 26: ...P x 3600 Isothermal compression heat QK mV x r Condensation heat QR mg x cp x ΔTa Cooling heat generally negligible ignored in calculation of QT m v mass condensed incoming vapour in kg h mg mass incoming gas in kg h P absorbed power at operating point in kW cP gas specific heat in kJ Kg x K r heat of vaporisation in kJ Kg ΔTa differential temperature in K between incoming gas TG and service liqui...

Страница 27: ...Operating manual liquid ring vacuum pumps TRVK TRSK 27 17 3 UNIT CONVERSION TABLE Absolute pressure Vacuum Dry air flow at 15 C Saturated vapour flow Saturated water temperature Vaporization heat ...

Страница 28: ...Operating manual liquid ring vacuum pumps TRVK TRSK 28 blank page ...

Страница 29: ...Operating manual liquid ring vacuum pumps TRVK TRSK 29 blank page ...

Страница 30: ...Operating manual liquid ring vacuum pumps TRVK TRSK 30 blank page ...

Страница 31: ...mpatibilità elettromagnetica EMC Directive 2014 30 UE Direttiva Bassa Tensione LVD 2014 35 UE EN 60204 1 2018 Sicurezza del macchinario Equipaggiamento elettrico delle macchine Safety of machinery Electrical equipment of machines EN 60034 1 2010 Macchine elettriche rotanti Valutazione e prestazioni Rotating electrical machines Rating and performace I Questa dichiarazione perde validità nel caso in...

Страница 32: ...ITALY Continuing research of POMPETRAVAINI results in product improvements therefore any specification may subject to change without notice 20022 CASTANO PRIMO Milano ITALY Via per Turbigo 44 Zona Industriale Tel 0331 889000 Fax 0331 889090 www pompetravaini com S p A ...

Отзывы: