36
Basic Operations
Boot System
DANGER: Proceed to the following steps only after installation checklist is
completed.
(1)
Switch on the POWER switch on the BCMS module, press START button for 1
second and release. Wait approximately 60 seconds for the BCMS and
Battery Modules to initialize.
(2)
Switch on the PV SWITCH on the Universal PCS.
(3)
Press the ON/OFF button on Universal PCS, and then wait approximately 60
seconds for the system to initialize.
(4)
Switch on the AC SWITCH on Universal PCS.
NOTE: When the system has been started and proper operation has been
verified, put the door of the battery system back on the cabinet. Lock it and store
the key safely for any service or maintenance.
Shut Down System
DANGER: Shut down the device and switch off all the external switches from
the home electrical panel for maintenance or extended period of non-use.
(1)
Press the ON/OFF button on Universal PCS.
(2)
Switch off the POWER switch on the BCMS module.
(3)
Switch off the PV SWITCH on the Universal PCS.
(4)
Switch off the AC SWITCH on Universal PCS.
Getting Started with the APP
(1)
Download the APP
Содержание iCAN NetZero Plus Series
Страница 1: ...iCAN NetZero Plus User Manual V1 0 0 ...
Страница 2: ......
Страница 13: ...10 Network Indicator Power Indicator Wiring Box Sealed Cap Run Indicator Status Indicator ...
Страница 29: ...26 Power cable wiring Communication and DC12V cable wiring ...
Страница 34: ...31 6 Connect the iCAN NetZero Plus to load ...