![PolyScience LX Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/polyscience/lx/lx_operators-manual_1578067011.webp)
110-874
9
Installation and Startup
1. Attach the Immersion
Circulator to the reservoir
(user-supplied). The mounting
clamp mounts securely to both
flat and rounded tank walls.
Allow a minimum of 1.3 cm /
0.5 inch clearance between
the bottom of the Circulator’s
housing and the bottom of the
reservoir.
2. Add liquid to the reservoir
.
The liquid in the reservoir
should be maintained
somewhere between the
“Maximum” and “Minimum”
liquid level lines embossed on
the housing.
WARNING
: See Reservoir Fluids (page 19).
WARNING
: Read the safety data sheet for the bath
fluid being used carefully before filling reservoir.
WARNING:
If the proper fluid level is not maintained,
the heater coil may become exposed and possibly
damaged (fluid level too low) or the bath may
overflow (fluid level too high).
!
3. Plug the power cord into a properly grounded electrical
outlet
. The LCD will light and the actual and set point
temperatures will appear on the display.
WARNING
: Make certain that the electrical outlet is
the same voltage and frequency as your Circulator;
the correct voltage and frequency are indicated on
the identification label on the back of the unit.
The use of an extension cord is not recommended. If
one is necessary, it must be properly grounded and
capable of handling the total wattage of the unit. The
extension cord must not cause more than a 10% drop
in voltage to the unit.
Minimum
Liquid Level
Line
Maximum
Liquid Level
Line
Содержание LX
Страница 1: ...110 874 PSC EN 25 February 2014 LX Immersion Circulator Operator s Manual ...
Страница 2: ......