SH1-1 Assembly - July 2012
Page 7 of 12
PC-000106 Washer
(3) Used in this step
PC-000100 Rivet
(3) Used in this step
PC-000121 Washer
(3) Used in this step
PC-000104 Rivet
(12) Used in this step
Step 6: Roof Installation
Place the
FS1-0061 top extrusion on the top edge of
the rear panel so that the miters line up with the left
and right extrusions, and that the grooved surface is
facing the outside. Place the roof on the top of the
unit with the arch in the roof going into the groove in
the top of the jamb. Put the rear edge of the roof in
the groove in the top rear extrusion. With someone
pushing down on the back of the roof, use the holes in
the rear extrusion as a drill guide, drill fi ve 13/64” holes
into the roof.
MAKE SURE TO ONLY DRILL THROUGH
THE ROOF AND NOT THROUGH THE BACK OF THE
TOP REAR EXTRUSION.
Rivet the top holes in both the
left and right rear extrusions as well as the fi ve holes
of the top rear extrusion using (7) PC-000104 rivets.
Push down on the front of the roof while using the
holes in the jamb as a drill guide, drill fi ve 13/64” holes
through the roof. Rivet in place using (5) PC-000104
rivets. Locate the holes in the top of each of the side
panels. Push out on the top of the side panel, and
using a 13/64” drill bit, drill a hole through the hole in the top of the side, and through the roof. Rivet in place using a PC-
000100 rivet on the inside with a PC-000121 washer and a PC-000106 back-up washer on the topside of the roof. Repeat
for all the holes in the top of the side panels but do not fasten the one closest to the hole for the vent stack at this time.
Step 7: Shower Assembly Installation
On the inside of the unit, push the top of the shower assembly plastic
body up into the vent stack hole in the left rear corner of the roof. Using
a black felt tipped marker, mark the spot where the hole in the shower
body lines up with the top of the side panel. Remove the shower body
from the vent stack hole, and drill a 1” hole through the side and roof in
the location just marked. Place the shower body back up into the vent
stack hole, and make sure that the hole that was drilled lines up with
the molded through hole in the shower body. With someone holding
the shower body in place, drill a 13/64” hole through the hole in the top
of the roof (that was drilled in step 6), and into the shower body. Rivet
in place using a PC-000105 rivet with a PC-000121 washer behind the
head of the rivet.
Marker
PC-000105 - Rivet
(1) Used in this step
PC-000121 Washer
(1) Used in this step
Содержание SH1 Fleet Series
Страница 12: ...SH1 1 Assembly July 2012 Page 12 of 12...