ASSEMBLY INSTRUCTIONS
3
1. LAY THE 5' BASE FACE DOWN ON A FLAT SURFACE.
2. OPTIONAL CASTERS. INSERT CASTER STEM INTO TUBE.
HAND-TWIST LARGE RING UNTIL CASTER IS SECURE.
3. TIGHTEN HEX BOLTS IN BASE SOCKETS IF NOT ALREADY
TIGHTENED. VERTICALS WILL REST ON THESE BOLTS.
LARGE RING
HEX BOLT LOCATIONS (4)