OPERATION
BREAK-IN PERIOD
SNOW BIKE SYSTEM BREAK-IN
Break-in Function
Engine Run
Time
Description
Chain: Drive and Chain Case
3 hours
Lubricate
Chain (Drive and Chain Case)
Deflection
3 hours
Check Tension
Brake Line Connections
3 hours
Check for leaks
Track Tension
3 hours
Check Tension
Swing Arm Bolt
3 hours
Re-Torque
Strut Rod Bolts
3 hours
Re-Torque
Front Axle
3 hours
Re-Torque
Ski Bolt
3 hours
Re-Torque
Drive with extra caution during the break-in period. Perform regular checks on
fluid levels, lines, and all other important areas of the snow bike.
35
OPERATION
Содержание Timbersled ST 120 RAW 2019
Страница 1: ...2019 Owner s MAnual TIMBERSLED ST 120 RAW...
Страница 3: ...2019 Timbersled Owner s Manual ST 120 RAW...
Страница 8: ...6...
Страница 54: ...52...
Страница 59: ...SPINDLE AND SKI Torque Torque q 50 Nm Tighten from Nut Side w 45 Nm e 18 Nm 57 SPECIFICATIONS...
Страница 60: ...58...
Страница 66: ...DATE HOURS TECHNICIAN SERVICE PERFORMED COMMENTS 64 MAINTENANCE LOG...
Страница 69: ......