7.16
FINAL DRIVE
new o-ring and torque bolts to
14 ft. lbs (19 Nm)
.
4.
Install the output hub (A) into the gearcase housing. Apply
a small amount of grease to the seal and seal surface as this
will aid assembly. The output hub should spin freely.
5.
Install the rollers and roll cage into the ring gear. Insert the
rollers as the roll cage is installed, installing the lower row
first and then the upper row.
6.
Install the ring gear over the output hub and into the output
cover. Insert the backlash pad (G) and set assembly
upright..
7.
Install the armature plate (D) onto the ring gear. Verify the
plate tabs are places into the slots on the roller cage.
NOTE: Verify backlash plate stays in place.
14 ft.lbs. (19 Nm)
A
G
D
D
Содержание 2006 HAWKEYE 2x4
Страница 84: ...NOTES ENGINE 3 46 ...
Страница 104: ...NOTES FUEL SYSTEM CARBURETION 4 20 ...
Страница 111: ...5 7 BODY AND STEERING POD EXPLODED VIEW ...
Страница 121: ...5 17 BODY AND STEERING ...
Страница 122: ...5 18 BODY AND STEERING ...
Страница 123: ...5 19 BODY AND STEERING ...
Страница 124: ...NOTES BODY AND STEERING 5 20 ...
Страница 152: ...7 10 FINAL DRIVE FRONT GEARCASE CENTRALIZED HILLIARD EXPLODED VIEW ...
Страница 181: ...8 13 CVT TRANSMISSION TRANSMISSION 18 ft lbs 24 5 Nm ...
Страница 186: ...NOTES CVT TRANSMISSION 8 18 ...
Страница 210: ...9 24 ELECTRICAL STARTER MOTOR EXPLODED VIEW BRUSH LENGTH SERVICE LIMIT 5 16 8 MM ...
Страница 216: ...NOTES ELECTRICAL 9 30 ...
Страница 217: ...10 1 WIRE DIAGRAM 2006 HAWKEYE 2X4 4X4 ...