Page 30 of 52
PG2021_SWC-V-ECM_02
Network Setup
1.
Disconnect the communication plug from the control box
2.
Communication plug
A, B, A, B is printed on the main PCB. When you connect the wires, please ensure connection of A to A and B to B.
3.
Connection wire
i.
If the total length of wire is more than 1000 m, please use shielded wire in order to protect the signal
transmission.
ii.
Complete wire connection
First unit
Middle unit
Last unit
Cooke Industries - Phone: +64 9 579 2185 Email: [email protected] Web: www.cookeindustries.co.nz