Page 16 of 65
PG2021 CHV2-VP-ECM-V2
Installation Location
Do not install the unit in rooms where flammable gas or alkaline acid substances are present. Aluminum/copper coils
and/or internal plastic components can be damaged irreparably.
Do not install in workshops or kitchens; drawn in oil vapors might deposit on the coils and alter their performance or
damage the internal plastic parts of the unit.
If installation of unit includes using a lift, insert a plywood sheet between the unit and the lift forks to avoid damaging
unit. (Figure B.5.1)
It is recommended to locate the unit near one side of room to ensure optimum air distribution. (Figure B.5.2)
Generally, the best louver position is the one which allows air diffusion along the ceiling. Alternative positions can be
selected.
Confirm sufficient space is provided to allow removal of panels from the ceiling in the selected position and to allow
enough clearance for maintenance and servicing operations.
Figure B.5.1
Figure B.5.2
Installation and False Ceiling Clearance
Verify inlet and outlet grilles are not obstructed to ensure proper air flow.
Confirm location allows condensate to be properly drained.
Confirm height between the bottom of upper deck and top of ceiling is sufficient for installation. (Figure B.6.1)
Ensure there is sufficient space around the unit to provide installation and service.
Figure B.6.1
Model
A (mm)
B (mm)
CHV2-01/02/03
Maximum 275
More than 10
Cooke Industries - Phone: +64 9 579 2185 Email: [email protected] Web: www.cookeindustries.co.nz