
Instruction manual
S12-250 ver. 2018
5/15
Item
Part/set description
Q-ty pcs
Part/set sketch
7
Plasticine forming knife
S-250-06-00
1
8
Wrench - to block the supporting
board in the tray
S-0250-000-08-00-01
1
9
Hex key to adjust the feet
M40 KL 5 W
1
10
Screwdriver to fasten white take-
off board to base board
1
3.
Assembly and installation
3.1. Embedding the foundation tray in the runway
The foundation tray (item 1) is to be embedded in the track in the prescribed place, so that the take-off line
–
the edge
of the white take-off board (item 3) which is closer to the landing pit, is in the distance of:
•
1 - 3 m (for long jump) to the landing pit edge that is closer to the take-off line
–
the
WA
international
competition rules,
•
13 m (for men) and 11 m (for women) to the landing pit edge that is closer to the take-off line
–
the
WA
international competition rules.
For any other competition, the distance shall be adjusted to competitors` level.
The installation point of the tray (item 1) of the take-off board is presented below.
Drawing 1. Installing the take-off board
–
general view