- 27 -
1600-GB Maintenance_2740
MAINTENANCE
GB
Set tyre tracking
Tyre tracking for the right and left tyres can be adjusted
from the rear steering linkage.
1. Open the locknuts (7, 8) (left and right threads)
2. Turn the tie rod (9) until the track is set correctly.
3. Lock the bar with the nuts (7, 8).
-
Set the toe-in to maximum 5 mm. This means that the
pitch of the tyres leading edges must be a maximum
5 mm less than the pitch of the tyres trailing edges. (in
direction of travel)
- The distance of the tie bar heads on the left and right
tie bars must be the same.
8
9
7
Tyres
Tyres
Dimensions
Air pressure
Chassis
1. *380 / 54 - 17 138A8
Flot+ ET -54
2. *340 / 55 - 16 133A8
Flot+ ET -50/6L
3. *15.0 / 55 - 17 12PR
AS ET -54/6L
1.5 bar
1.5 bar
1.5 bar
Rotor
16 / 6.50 - 8 10PR
1.5 bar
Tyres marked * may only be fitted in
position, due to the impression being
narrower, otherwise the forces acting on
the steering are too great. (See illustration)
289-12-34
ET -50 / -54
Tine arms
Changing tine arms
- Loosen cover bolts (10).
10
- 1. Remove 2x bolts M12x110 (11)
2. Loosen 4x bolts M12x110 (12).
12
11
- Pull cover off
- Pull tine arm out. Turn the rotor unit so that the old
tine arm can be pulled out between the intake and
out-take (see below).
- Insert new tine arm. Turn the rotor unit so that the
new tine arm can be inserted between the intake
and the out-take (see below).
Direction of
travel