- 16 -
1400_GB-WARTUNG_2611
GB
Maintenance
Tine arms
Change tine arms
- Loosen cover bolts (1).
1
- 1. Remove 2x bolts M12x110 (2)
2. Loosen 4x bolts M12x110 (3).
3
2
- Pull off cover
- Pull out tine arm. Turn the rotor unit so that you can
pull out the old tine arm between intake and outtake
(see below).
- Insert new tine arm. Turn the rotor unit so that the
new tine arm can be inserted between the intake
and output control (see below).
- Re-tighten bolts M12x110 with 1x nut and 2x Nordlock
washers (see Fig.)
(tightening torque: 140 Nm)
Position the Nordlock washers with the rough milling
inside on top of one another. This means that both
washers have the fine milling outside.
Note:
Pay attention to the
position of the
dowel pins!
(see Detail B -
Fig.: 289-12-20)
- Secure cover on the new tine arm, insert between the
covers and tighten screw. Tighten all the loosened
bolts (1) for the covers.
- Check the tightness of the bolts and nuts after approx.
50 hours of operation and retighten if necessary.
B