- 18 -
0900-GB ANBAU_8548
ATTACHING TO TRACTOR
GB
Mounting front tank
Mounting tank to front three-point hydraulics
- Kat II or coupling triangle
- Secure
properly!
Fitting front p.t.o. for the blower drive
- 1000 rpm, clockwise direction of travel
- Adapt/fit cardan shaft (see Supplement “Cardan
shaft”
Ensure that cardan shaft length is lying
horizontal and in lowered position!
Front tank and cardan shaft should lie horizontal
when in operation.
- Adjust through upper link length and lifting
height.
Connect conveyor spiral hoses
(according to “Fitting the Hoses” description)
Connect front cable assembly
- Connect plugs (S1, S2, S3) to the appropriate
sockets
Connect hydraulic lines
- With hydraulic blower drive couple line to point (H)
Adjusting see chapter "Hydraulic blower drive"
Mounting the seeding rail
Fitting the seeding rail
- Fit seeding bar, which sits on supports (1), to a
soil-tilling implement.
- Secure
properly!
- After lifting implement remove stand (A) by removing
linch pin (2).
Connect conveyor spiral hoses
(according to “Fitting the Hoses” description)
Connect front cable assembly
- Connect plug (S) to the appropriate socket
Connect hydraulic lines
- Spur marker - double action
- Coulter pressure adjustment – single action