PMI Master Blaster MB8 Скачать руководство пользователя страница 2

INTRODUCTION

Install float valve and hose adapter

Attach the float valve to the cabinet as shown below. 

Locate a knock-

out  in  the  bottom  of  any  of  the  four  corner  posts. 

The  garden

 

hose 

adapter  attaches  to  the  brass  inlet  fitting  on  the  float  valve. 

NOTE:

 

verify that the hose washers are correctly in place. 

Water connection and float adjustment

Move cooler to desired location (this 

must

 be a level area for proper 

operation of the cooler).

1.

Connect to water supply using a commercial grade of water hose

 

(not supplied with cooler, obtained separately) to the adapter on

 

the 

float valve and turn water on. CAUTION: water inlet pressure

 

should 

be limited to a maximum of 65 PSI to avoid rupturing the

 

water 

hose. If pressure exceeds this value, an inline pressure

 

regulator 

should be installed (obtainable from a local plumbing or

 

hardware 

store).

2. Check that all connections are tight by visually inspecting hose, float 

valve, etc. for leakage. 

3. Set float valve for a water depth of 2-1/2". The float is adjusted by 

lightly bending the float rod.

Your evaporative air cooler was thoroughly tested and inspected 
before leaving the factory. This is your guide to economical, trouble 
free comfort cooling over the years with reasonable care and regular 
maintenance. Failure to follow these instructions may damage your 
cooler, impair its operation and/or void the warranty

Read it carefully.

SET UP FOR ROLL-AROUND USE

• Open parts box & remove casters from parts bag. Assemble each

caster (Fig.1) per caster plate using supplied 1/4-20 nuts & carriage
bolts.

• Place casters w/ brakes on the front of the unit, and the casters

without the brakes should be mounted on the back of the cooler.
Use 

16

 of the 1/4-20 bolts from the parts bag to secure all 4 of the

casters to their respective caster plates. Apply brakes before lifting
cooler upright to complete assembly.

2  Master Blaster Use and Care Manual

PREPARATION FOR ASSEMBLY

Remove the pad frames by slightly lifting the pad frame from the 
bottom, pull outwards until clear of cabinet bottom pan, then 
downwards until frame clears cabinet top. Remove the following 
items from the cooler:
1. Box containing swivel casters and attachment hardware.
2. Plastic bag containing small parts, float valve, garden hose adapter,
hose nut, hose washer, o-ring.
3. Bag with hose adapter for float valve (roll-around use)

Gather tools required to assemble & install unit

The following tools are required to assemble the unit:
7/16" box or open end wrench
3/8" box or open end wrench

6" crescent wrench
1/4" nut driver

Figure 1

Install Overflow Standpipe / Drain Line

Install overflow drain bushing in bottom of cooler as follows:

• Slide rubber washer over the brass drain

bushing.

• Push drain bushing through bottom of

cooler, assemble and tighten lock nut.

• Screw plastic overflow standpipe into the

drain bushing and tighten snugly (hand
tight) to prevent leakage.

• Where conditions allow for drainage,

connect a drain line (garden hose) to
drain bushing.

Motor and blower wheel check

Check motor mounting to be sure all screws and nuts are 

tightened down properly. Rotate blower wheel by hand to see that 

it moves freely without rubbing against housing.

Cooler checkout and first time start-up

Congratulations, once you re-install the pad frames, your roll-around 
Master Blaster cooler will be complete and ready for use. Please 
proceed to the Pre-startup inspection checklist on page 3 before starting 
unit for the first time

.

   CAUTION:

Never operate unit with pad frame(s) 
and/or air outlet grille removed. This 
will result in an overloaded condition 
and may damage the motor.

Содержание Master Blaster MB8

Страница 1: ...te this blower fan motor with any solid state speed control device Do NOT operate this unit with pad frame s and or air outlet grille removed this may cause the fan motor to overload and damage the mo...

Страница 2: ...4 20 bolts from the parts bag to secure all 4 of the casters to their respective caster plates Apply brakes before lifting cooler upright to complete assembly 2 Master Blaster Use and Care Manual PRE...

Страница 3: ...ts The motor and or pump can restart automatically when they cool down To verify and check out the cooler installation on initial start up the following procedure should be followed Push PUMP switch t...

Страница 4: ...CAUTION Disconnect all electrical power to the cooler before attempting to install open or service your cooler CAUTION Do not allow pump to fall over and become submerged water will damage pump motor...

Страница 5: ...p cooling pads will not work and will void your warranty 5 Lay new rigid media pads into the louver panel assy paying attention to how the slit at the bottom of the pad is oriented 6 Return the rigid...

Страница 6: ...off to cooler Turn on water supply No water Fill reservoir Motor does not start or no air delivery Electrical power disconnected Check power receptacle and cord Defective motor Replace motor Defective...

Страница 7: ...73 5 SWITCH BOX ASSEMBLY 05 007 0214 5a SWITCH PUMP 05 007 0147 5b SWITCH FAN 05 007 0148 5d SWITCH COVER 05 007 0215 6 POWER SUPPLY CORD 05 007 0186 7 CASTER COMPLETE SET OF 4 05 001 0152 8 FLOAT VAL...

Страница 8: ...other rights which vary from state to state Garantia Limitada Enfriador Evaporativo Phoenix Manufacturing Inc Phoenix Arizona extiende esta garant a limitada al comprador original de este enfriador e...

Отзывы: