0000112607/010420/A ControlGo
12
Fig. 4.22
A B
C
D
C
B
5
D
A
20
23
24
+
–
A B
+ –
+ and – connection
• Remove the cover cap and install another cable gland
inside the filter module (
+
).
• (1) Put a pneumatic hose through the
+
connection.
• (2) Put the hose through the other cable gland into the
filter compartment.
• (3) Put the other hose through the
–
connection.
Fig. 4.23
+
+
–
1
2
3
Cable glands and pneumatic hoses
• Make sure to have approx. 25 mm (1 in.) (A+B) hose end.
• Tighten all cable glands.
Fig. 4.24
+
+
–
A
B
Pneumatic hose ends
4.5.2 SCS
• Connect the two pneumatic hoses to the corresp
and – (A+B) on the junction box.
Fig. 4.25
A B
Compressed air connection
5
COMMISSIONING
5.1
General
• Make sure that the Panel is connected to the mains.
• Turn on the main switch (refer to Fig. 6.1E).
5.2
Commissioning checklist
√
√
√
#
Check
Ref.
par.
OK
1.
Is the addressing sequence of the filter
modules correct?
Extraction fan
2.
• Push the START/STOP FAN button (ref.
• Push the button again to stop the fan.
Filter cleaning system
3.
MDB only:
• Push the FILTER CLEANING button (ref.
Fig. 6.1G) to activate the filter cleaning
system.
• If applicable: apply precoat material to
the filter cartridges; refer to the MDB
manual.
• Push and hold the START/STOP FAN
button for 20 seconds to activate the
precoat timer. Feedback: the green LED
blinks 4 times and the buzzer sounds
shortly.
SCS only:
Do not test this function to maintain the
protective layer of precoat.
Plymovent VFD/Panel (frequency inverter) (option)
4.
Have you changed the parameter set
*)
into 1
(PT-1000) or 2 (PT-2500)?
Refer to the
instruction sheet supplied with the VFD/Panel.
*)
Default setting = 3 / ControlPro
If any problems or errors occur, refer to chapter 8 /
5.3
Learning Mode
The Learning Mode is only applicable for MDB systems and
systems with
two
connected SCS systems (master/slave).
ATTENTION
ControlGo Panels are factory-wise prepared for use
with either MDB or SCS filter systems. They are
not
interchangeable.