REAR PANEL (A)
2" WOOD SCREW
SWING BEAM PANEL (B)
5/4 X 6 X 28"
PANEL SLAT (4 ON REAR, 4 ON LEFT SIDE)
FRONT PANEL SLAT SPACING
ALL THE SLATS ON THE FRONT
MUST BE RESTING ON THE
DECK. ALL FOUR FRONT SLATS
ARE 26-3/4" LONG.
MAKE THIS SLAT FLUSH TO THE
END OF THE 2 X 4 X 14"
BOTTOM PANEL BOARD.
SPACE THE NEXT SLAT
EQUALLY BETWEEN THE FIRST
SLAT AND THE CORNER POST.
5/4 X 6 X 26-3/4"
PANEL SLAT (4 ON FRONT)
STEP 31: PANEL SLATS
1: FIND EIGHT 5/4 X 6 X 28" PANEL SLATS AND FOUR 5/4 X 6 X 26-3/4" PANEL SLATS.
2: INSTALL THE PANEL SLATS AS SHOWN BELOW. SEE DETAILS BELOW FOR MEASUREMENTS.
3: ATTACH THE PANEL SLATS TO THE FORT WITH 2" WOOD SCREWS IN THE PRE-DRILLED HOLES.
SPACING
2"
1 12 "
2"
REAR PANEL SLAT SPACING (A)
SWING BEAM PANEL (B)
1
12"
4 "
2
"
2"
2 14
2"
58
Содержание Sweetwater II 2401
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 11: ...Model 2401 BOXES 2401 1 2401 2 Slide Box REV 3 2 2018...