CORNER POST #1
CORNER POST #4
FRONT OF PLAY SET
CORNER POST #2
CORNER POST #3
REAR CORNER
POSTS WILL HAVE
AN EXTRA HOLE
AT THIS LOCATION
3 X 3 X 96"
CORNER POST
STEP 1: CORNER POST LAYOUT
1: THIS STEP IS CRITICAL TO BUILDING THE FORT PROPERLY. IF ANY MISTAKES ARE MADE HERE, YOU WILL NEED TO
DIS-ASSEMBLE AND THE RE-ASSEMBLE TO MAKE YOUR CORRECTIONS.
2: LAY OUT EACH OF THE 3 X 3 X 96" CORNER POSTS IN THE AREA YOU INTEND ON BUILDING THE FORT SIDE OF THE
PLAYSET.
3: USE THE DIAGRAM BELOW TO CORRECTLY IDENTIFY AND ORIENT THE POSTS IN THE CORRECT DIRECTION.
NOTE: THE SLIDE SIDE IS CONSIDERED THE FRONT OF THE PLAYSET WITH THE SWING BEAM EXTENDING OFF TO THE
LEFT SIDE.
28
Содержание Sweetwater II 2401
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 11: ...Model 2401 BOXES 2401 1 2401 2 Slide Box REV 3 2 2018...