background image

www.dero.com     |     1-888-337-6729

© 2018 Dero

BIKE DEPOT

Installation Instructions - Panels

For shelters with front panel in place of doors, 
attach rear panels in the front of the shelter.

Attach the doors with (1) 3/8 x 1.75” carriage bolt, (1) 
brass sleeve bearing, (1) 3/8” washer, and (1) Penta nut 
at each hinge.  Tighten the Penta nuts.  Then tighten 
hinge Penta nuts.

Attach both upper door stops with (2) 3/8 x 3” carriage 
bolts, (2) 3/8” carriage bolt washers, (2) 3/8” washers, 
and (2) Penta nuts at each stop.  

Attach (4) hinges with (4) 3/8 x 5” carriage bolts, 
(4) 3/8” carriage bolt washers, (4) 3/8” washers, 
and (4) Penta nuts at each hinge.  If the uprights 
are not perfectly vertical, a washer may be 
placed between the hinge and upright to align 
the axis of the hinges.  Leave the bolts finger-
tight.

4

6

7

5

Содержание DERO BIKE DEPOT

Страница 1: ...Parts List 5 4 2 1 3 A B C D UPRIGHT BACK WELDMENT TRUSS WELDMENT UPRIGHT FRONT WELDMENT PURLIN WELDMENT TYPE S DECK 2 5 X 5625 1 2 3 4 5 12 1 4 SELF DRILL SCREWS 4 1 2 BOLTS 4 1 2 BOLTS 4 1 2 DIA SIMPSON STRONG BOLT 2 ANCHORS 3 5 MIN EMBEDMENT A B C D ...

Страница 2: ...nry Bits 3 8 1 2 BIKE DEPOT Installation Instructions Main Structure C C D D 0 4 6 PAD THICKNESS 1 0 FOOTING BOTTOM 8 5 8 REBAR 9 5 8 REBAR 0 3 4 1 1 1 9 2 6 3 2 3 6 3 3 7 6 11 0 SECTION C C SCALE 1 24 3 000 PSI CONCRETE FOOTING 3 6 X 3 6 X 12 WITH 5 5 X 3 BOTTOM EACH WAY 3 CLEAR FROM BOTTOM 0 4 6 PAD THICKNESS 9 5 8 REBAR 1 0 FOOTING BOTTOM 8 5 8 REBAR 0 3 4 1 1 1 9 2 6 3 2 3 3 3 6 12 0 15 6 SECT...

Страница 3: ...ctions 0 0 1 9 3 6 12 0 13 9 15 6 1 9 3 6 7 6 9 3 11 0 3000328 A SCALE 1 100 SIZE DWG NO A REV SHEET 3 OF 12 A 12 0 A A 3 CLEAR FROM BOTTOM SECTION A A SCALE 1 36 3 000 PSI CONCRETE FOOTING 3 6 X 3 6 X 12 WITH 5 5 X 3 BOTTOM EACH WAY 3 000 PSI CONCRETE PAD 4 6 7 6 12 0 ...

Страница 4: ... with 8 1 2 x 5 5 bolts 16 lock washers and 8 nuts each Fully tighten after all purlins are in place Tighten all upright and truss bolts Lift trusses into place and fasten to uprights with 4 x 1 5 carriage bolts 4 lock washers and 4 nuts at each upright Leave finger tight Place the first section of type S decks and fasten with 4 self drilling screws to the truss Place the next section of type S de...

Страница 5: ...present Place a side panel in the lower position and attach with 4 3 8 x 5 5 carriage bolts 4 3 8 carriage bolt washers 4 3 8 washers and 4 Penta nuts Tighten all 6 bolts Place and attach the remaining side panels Place and attach the rear panels with the same method as the side panels 1 3 2 BIKE DEPOT Installation Instructions Panels Front Panel Mounting Location For shelters with front panels in...

Страница 6: ...t each hinge Tighten the Penta nuts Then tighten hinge Penta nuts Attach both upper door stops with 2 3 8 x 3 carriage bolts 2 3 8 carriage bolt washers 2 3 8 washers and 2 Penta nuts at each stop Attach 4 hinges with 4 3 8 x 5 carriage bolts 4 3 8 carriage bolt washers 4 3 8 washers and 4 Penta nuts at each hinge If the uprights are not perfectly vertical a washer may be placed between the hinge ...

Страница 7: ...tach the door lock bar to the right door with 8 x 3 carriage bolts 4 front door stops 4 spacers 8 washers 4 tube clamps and 8 nylock nuts Once bolts are tightened the lock bar should rotate freely Attach the latch assembly and cover with 6 3 8 x 1 security bolts and 6 3 8 washers The latch assembly can be laterally positioned so the lock bar strike enters and exits the latch smoothly Fill the 8 3 ...

Отзывы: