Place uprights on concrete pad over footings (see
step 1). Confirm all uprights are properly spaced
and square. Using the upright foot as a template,
drill (4) 1/2” diameter x 6” holes at each upright.
Install wedge anchors with nuts finger-tight. See
shelter assembly drawing for specific upright
placement locations. If there’s an elevation
change at the uprights, a non-shrink, 3,000 psi.
grout pad may be used. Longer anchors may be
needed to maintain a 3.5” min. embedment.
Install the purlins with (8) 1/2” x 5.5” bolts, (16) lock
washers, and (8) nuts each. Fully tighten after all
purlins are in place.
Tighten all upright and truss bolts.
Lift trusses into place and fasten to uprights
with (4) ½” x 1.5” carriage bolts, (4) lock washers,
and (4) nuts at each upright. Leave finger-tight.
Place the first section of type S decks and
fasten with (4) self-drilling screws to the
truss. Place the next section of type S decks
with 3 ridges overlapping and fasten with
(4) self-drilling screws through both sections
to the purlins. Each deck will provide 27.5”
of coverage. Continue until done. The last
section will require (8) self-drilling screws.
2
4
5
3
BIKE DEPOT
Installation Instructions - Main Structure
Rear uprights
Front uprights
(more holes)