Installation and user guide for PLATINUM® inverters 3800 TL, 3801 TL, 4300 TL, 4800 TL, 5300 TL, 6300 TL, 7200 TL
Placing into operation
4 Placing into operation
4.1 Switch on
1. Switch on mains voltage supply (safety device).
2. Switch on the DC voltage via the DC disconnect
on the underside of the device or via the external
isolation device.
The inverter type appears on the display along
with the prompt “STArT?”.
4.2 Initial operation
▪
To transfer all settings correctly, initial operation must be conducted in
full once.
▪
When installing several inverters that are linked with each other via the
PLATINUM® network (EIA485), initial operation can be performed on
any inverter (master programming). for this to be possible, all inverters
in the network must be switched on.
▪
The inverter automatically transfers the setting values to the other
inverters via the PLATINUM® network (EIA485).
▪
Every inverter is allocated a number automatically during initial
operation. This number can be changed and freely assigned in a further
step.
▪
The inverters on which no data is entered display different screen
content depending on the menu. If data cannot be entered, the
inverter displays the start screen.
▪
During initial operation, all inverters connected to the PLATINUM®
network are blocked.