4. Operation
Testing before putting into operation
– Check whether the delivered hoist or trolley complies with your order, whether it is
compete and all screws and nuts are firmly tightened.
– Make sure that no transport damage has occurred.
– Transfer the data from the nameplate to your Operating Manual upon inspection.
– Ensure that the Operating Manual is at hand at the equipment or that it is handed
over to a supervisor.
– Check whether the load-bearing construction taking up the hoisting equipment
complies with the load-bearing capacity required.
– A statical expertise is to be obtained if necessary.
– Chain hoists made movable by means of a trolley or which were already delivered
with a trolley are subject to the accident prevention regulations for cranes (VBG
9 of the Trade Association). An acceptance test must be carried out by a
crane
expert
prior to initial commissioning. Upon request, you can call for our experts or
have us find them.
Installation instructions
– Do not use the Trolley outdoors when it is not protected (greased) or leave it
outside.
– If it is still necessary to use the Trolley outdoors, a roof or a sheet metal hood over
the hoist to protect it from rain and other environmental influences is useful. A
new device is not subject to functional restrictions for outdoor operation or harmful
environmental influences, but in time, greater or lesser corrosion cannot be ruled
out, which does not constitute a guarantee claim. Above all, high temperatures,
high degrees of humidity, atmospheres with acidic vapours or corrosive gases or
high levels of dust concentration cause premature wear and can lead to mechanical
damage on moving parts. More frequent maintenance and repair is then
recommended.
– A spare device should be kept ready in case of frequently used hoists at important
points subjected to heavy loads to avoid production damage in the event of a
failure.
– Do not use the chain hoist under -20°C or above +60 C° without consulting our
technical advisors, as the metal parts may otherwise become brittle.
Содержание GTM
Страница 2: ......
Страница 12: ...12 8 Annual UVV inspections Type of test Test date Name signature of the tester Findings ...
Страница 14: ...Notes ...
Страница 15: ...Notes ...
Страница 16: ...Ihr verantwortlicher Lieferant PLANETA Hebetechnik GmbH ...