![background image](http://html1.mh-extra.com/html/planet-networking-and-communication/upoe-1600g/upoe-1600g_user-manual_1563895020.webp)
User’s Manual of UPOE-800G / UPOE-1600G
Step 5:
Supplying Power to the Ultra PoE Managed Injector Hub.
A.
Connect one end of the power cable to the Ultra PoE Managed Injector Hub.
B.
Connect the power plug of the power cable to a standard wall outlet.
When the Ultra PoE Managed Injector Hub receives power, the Power LED should remain solid Green.
2.2.2 Rack Mounting
To install the Ultra PoE Managed Injector Hub in a 19-inch standard rack, follow the instructions described below.
Step 1:
Place your Ultra PoE Managed Injector Hub on a hard flat surface, with the front panel positioned towards your
front side.
Step 2:
Attach a rack-mount bracket to each side of the Ultra PoE Managed Injector Hub with supplied screws attached to
the package.
Figure 2-2-2
shows how to attach brackets to one side of the Ultra PoE Managed Injector Hub.
Figure 2-2-2:
Brackets attaching to the Ultra PoE Managed Injector Hub
You must use the screws supplied with the mounting brackets. Damage caused to the parts by
using incorrect screws would invalidate the warranty.
Step 3:
Secure the brackets tightly.
Step 4:
Follow the same steps to attach the second bracket to the opposite side.
Step 5:
After the brackets are attached to the Injector, use suitable screws to securely attach the brackets to the rack, as
shown in
Figure 2-2-3.
20