Planar UlraLux 80 Скачать руководство пользователя страница 5

 

 

 

008-0159-00A 

2013 

 

Wood dowels tacked onto the adhesive 

 

4.

 

Hang the touchscreen onto the display with the help of another person. Swing the bottom of the 
touchscreen out slightly at a small angle to prevent the touchscreen from sticking to the display. 

5.

 

Center the touchscreen using the lit display’s active area as a guide. 

6.

 

Once satisfied with the touchscreen position, remove the liner completely from the VHB tape and then 
remove the dowels starting from the top. Ensure that the touchscreen does not move while removing 
the dowels. 

7.

 

Press on top of the tape location to bond the top of the touchscreen to the top of the display. 

8.

 

Remove the dowels on both sides of the touchscreen. Ensure that the touchscreen does not move while 
removing the dowels. Press on top of the tape location to bond the touchscreen to the display. 

9.

 

Remove the bottom dowels and press on top of the tape location to bond the touchscreen to the 
display. 

10.

 

Install the two bottom brackets to secure the bottom corners of the touchscreen. 

11.

 

At this point, the touchscreen is mechanically installed. 

 

 

 

Содержание UlraLux 80

Страница 1: ...horizontal surface 3 Perform a quick parts inventory and make sure that the following are included a Touch bezel b Mechanical Corner Brackets 2 A brackets and 2 B brackets c USB cable d PQ Labs Power...

Страница 2: ...least the 12 inch size tweezers small knife needle nose or long nose pliers and diagonal cutters 5 Use Isopropyl Alcohol to clean and wipe down the front glass at least two inches from all four edges...

Страница 3: ...located at the bottom left corner when looking at the front of the display For portrait mode installation the orientation of the touchscreen is such that the USB and power pigtail is located at the to...

Страница 4: ...e touchscreen 2 Remove the adhesive liners from the VHB Very High Bond tape along the back of the touchscreen 3 Tack on the provided wood dowels to the VHB tape so you can remove it from the front The...

Страница 5: ...dowels starting from the top Ensure that the touchscreen does not move while removing the dowels 7 Press on top of the tape location to bond the top of the touchscreen to the top of the display 8 Rem...

Страница 6: ...idental sticking and allow centering and adjustment of the touchscreen during installation 4 Hang the touchscreen onto the display using the two brackets Swing the bottom of the touchscreen out slight...

Страница 7: ...ion of bottom brackets to be installed 11 At this point the touchscreen is mechanically installed USB and Power Hook up 1 Using the display service kickstand swing out the display If you are only usin...

Страница 8: ...The different menus are described below 1 On the PC select the Start menu All Programs and then PQLabs Software 2 Click on MultiTouch Platform to open the PQLabs MultiTouch Platform window Touchscreen...

Страница 9: ...ing programs enabled Tuio Support Flash Tuio Support Handwriting Optimization Enable Windows Native Touch Enable Mouse Keyboard Simulation and Launch When Windows Starts Up Flexible Scan Rate is at a...

Отзывы: