51
/124
51
/64
EN
This manual is the property of PIUSI S.p.A. Any reproduction, even partial, is forbidden.
EN (translated from italian)
CUBE • MC
13 STARTING
FOREWORD
To correctly commission the CUBE MC the sequence of operations indicated below must
be followed and the MC control system functions must be known (see attached manual).
ELECTRICAL
POWER
SUPPLY
Once the power connections have been made, the CUBE MC can be energised by means
of the master switch to be fitted by the installer on the upstream line. Switching on of the
MC system will be indicated by the lighting up of the two backlit LCDs fitted on the front.
Even when the nozzle is taken out of its seat, the pump WILL NOT start as it has not been
enabled by the MC system.
WETTING
THE PUMP
CUBE MC features a self-priming pump that makes first startup easier. To start the appli-
ance, the suction pipe need not therefore be completely full of diesel fuel. For quick priming,
especially in the case of installations distinguished by a considerable difference in level be-
tween the pump and the tank, it is however important for the pump to be “wetted”, meaning
that there must be a small quantity of diesel fuel inside the impeller chamber. The pump is
supplied adequately “wetted” and ready for use. If however the installer considers the pump
to be totally dry, perhaps due to prolonged storage, he will have to wet it as he thinks best.
STATION
CONFIGURATION
Every CUBE MC station can be adapted to the specific requirements of the
station manager. To do this the MC control system must be CONFIGURED.
ATTENTION
MC configuration is crucial and must be done by skilled personnel. To per-
form this operation, the MC manual must be carefully and thoroughly read.
After completing configuration, user PIN CODES can be assigned to the per-
sons charged with using CUBE MC, in accordance with the detailed informa-
tion in the MC manual
DISENGAGING
THE
“MC” SYSTEM
All the CUBE MC functions are controlled by the MC control system. The MC
system can never the less be disengaged for any startup or maintenance activi-
ties requiring repeated pump starting. In these case, it is often convenient to
simplify pump startup by not having to enter any code and record any dispens-
ing data. To do this, a JUMPER has been fitted on the card that permits switch-
ing from AUTOMATIC mode (code request to access dispensing) to MANUAL
mode (no code request).
ATTENTION
The jumper is only accessible by opening the front panel and is positioned
as shown in the photo. In this operating mode, MC does not record any data
relating to performed dispensing operations. BEFORE ACCESSING THIS
JUMPER, ALWAYS INTERRUPT THE POWER SUPPLY
In MANUAL mode:
• The MC LCDs could be off or con-
tinue to display whatever was showing
at the time of switch over from AUTO
to MAN.
• To start the pump, no PIN CODE is
required; the pump will start as soon
as the nozzle is taken off its seat and
will stop when the nozzle is put back.
• The quantity dispensed by CUBE
MC is not indicated in any way.
Содержание CUBE 70 MC
Страница 2: ...M0104 E 2 64 Installazione uso e manutenzione Bulletin M0104 E ITALIANO ...
Страница 32: ...M0104 E 32 64 Installazione uso e manutenzione ...
Страница 62: ...M0104 E 62 64 Installation use and maintenance ...
Страница 63: ......