89
open the liner package. spread the liner so as to bring the bottom of the pool
near to the perimeter of the metallic structure already assembled.
insert the upper zinc-plated poles
A
in
the upper pocket of the white border
through the special opening leaving the
two curved ends of the pole out.
the curved ends of the upper pole a have
to be inserted in the upper holes of the
oval poles
B
on the structure previously
assembled
after inserting all the upper poles
A
turn each oval vertical pole once again
as shown in the picture. this stretch the
white border of the pool.
insert one of the ends of the junction
F
in the little transparent pVC pipe
E
.
6
7
8
9
10
Содержание AZUR 2000
Страница 33: ...33 ...
Страница 65: ...65 ...
Страница 97: ...97 ...
Страница 129: ...129 ...
Страница 130: ...130 ...
Страница 131: ......
Страница 132: ...Importateur Suisse PAMATREX SA Rue des Petites Berges 10 CH 1530 Payerne www pamatrex ch ...