Installation
12
Installation
Location
For the best overall performance, install the Piranha in a location that is clean and well
lighted. Provide sufficient space in all directions to allow for the material lengths of the
work pieces to be processed by the Piranha.
Foundation
To maintain the accurate alignment built into the Piranha, and to prevent undue stress on
the moving parts under a load, the Piranha should be placed on a stable base or floor
adequately constructed to withstand the unit weight.
NOTE: Use the leveling bolts
provided with the machine.
Wiring
The Piranha is shipped totally wired through the electrical enclosure box. It has been left
to the owner's discretion whether to wire direct to an electrical disconnect, or to install a
cord and plug for mobility of the Piranha.
CAUTION:
Compare machine wiring to input voltage
prior
to connecting power.
Only connect the specified voltage to the machine.
Lifting
The lifting lug on the Piranha is an integral part of the machine. Use a device with
adequate lifting capacity to handle the Piranha.
CAUTION:
The unit is exceptionally
top heavy
! Lifting from the underside of the
machine may cause damage to the cabinet structure.
Assembly
The Piranha is pre-assembled at the factory. The only requirements are the addition of
hydraulic oil and electrical power.
Содержание P65
Страница 10: ...Dimensional Data 10 Dimensional Data 24 66 42 60 ...
Страница 31: ...Piranha Ironworker P65 31 P65 Basic Machine Illustrated ...
Страница 35: ...Piranha Ironworker P65 35 Shear Hold Down Assembly Illustration ...
Страница 37: ...Piranha Ironworker P65 37 Punch Assembly Illustration ...
Страница 39: ...Piranha Ironworker P65 39 8 Bending Assembly Optional Illustration ...
Страница 42: ...Ordering Repair Parts 42 ...
Страница 45: ...Piranha Ironworker P65 45 Valve Body Assembly Illustrated Part Number 0231530 2 0 109 ORIFICE DISK ...