Unpacking & Plugging In- Installation of Pioneer Smart Controller in Pioneer AC
Step1: Power off your AC from the mains circuit breaker and open
the Front Panel of your Air Conditioner.
Step 2: Inside the front panel, you will find a docking station as shown in the
red border below. Remove its screw and take it off.
1