NOTICE
Proper maintenance is necessary with all propane powered floor
machines. Following the scheduled maintenance procedures found in
your operation manual will provide many years of uninterrupted service.
In addition to the scheduled maintenance procedures listed it is
recommended to have your machine serviced by certified service personnel
every three months. This service should include an emissions check.
Instructions For Use
Failure to read and understand this manual before operating this machine or performing service
on this machine may result in injury to the operator or nearby personnel or result in damage to the
machine or nearby property. Each operator must be trained in the operation of this machine before
being allowed to use it. Contact Amano Pioneer Eclipse Customer Service at 1-800-367-3550 or
+1-336-372-8080 or an authorized Amano Pioneer Eclipse Distributor to inquire about training or to
request a replacement manual.
Содержание PE420BU
Страница 1: ...UHS Propane Burnisher PE420BU Operator s Manual ...
Страница 2: ......
Страница 30: ...30 Electrical Schematic Base Model w o Options ...
Страница 32: ......
Страница 33: ...33 Electrical Schematic w Optional Clutch EcoSense ...
Страница 34: ...34 Connections w Optional Clutch EcoSense ...
Страница 36: ...36 Electrical Schematic w Optional SafeStop ...
Страница 37: ...37 Connections w Optional SafeStop ...
Страница 38: ...38 Connections w Optional SafeStop ...
Страница 39: ...39 ...
Страница 42: ...42 Handle Assembly RF034100 070815 15 14 11 12 13 10 8 7 2 6 3 4 1 5 4 9 CLUTCH MODELS 3 ...
Страница 56: ...56 40 Deck Assembly ...
Страница 58: ...58 40 Dust Collection ...
Страница 60: ...60 40 Main Assembly ...
Страница 61: ...61 40 Main Assembly continued ...
Страница 62: ...62 Torsion Bar Adjustment ...
Страница 66: ......