21
Scheduled Maintenance
Maintenance
Operation
Daily
First 100
Hrs.
Every 250
Hrs
Every 500
Hrs.
Check & add engine oil
l
Check for loose or lost fasteners
l
Check for oil leakage
l
Inspect fuel hose and connections
l
Clean Engine dust filter
l
Inspect pad holder
l
Change engine oil filter
l
l
Change Sentinel Propane Engine Oil
l
l
Check & clean air cleaner paper element
l
Check & clean air cleaner foam element
l
Inspect battery and battery connections
l
Replace air cleaner paper element
l
Replace air cleaner foam element
l
Inspect, clean, & re-gap spark plugs, Replace
if necessary
l
Check & adjust valve clearance.* Retorque
heads.*
l
Clean & lap valve seating surface.*
l
Check engine emissions
l
Clean cooling fins
l
Inspect drive belt
l
Inspect burnishing head assembly
l
Replace drive belt
Interval
* Check FS481V Service Manual. Contact Amano Pioneer Eclipse Certified Technician.
As Required
Содержание PE420BU
Страница 1: ...UHS Propane Burnisher PE420BU Operator s Manual ...
Страница 2: ......
Страница 30: ...30 Electrical Schematic Base Model w o Options ...
Страница 32: ......
Страница 33: ...33 Electrical Schematic w Optional Clutch EcoSense ...
Страница 34: ...34 Connections w Optional Clutch EcoSense ...
Страница 36: ...36 Electrical Schematic w Optional SafeStop ...
Страница 37: ...37 Connections w Optional SafeStop ...
Страница 38: ...38 Connections w Optional SafeStop ...
Страница 39: ...39 ...
Страница 42: ...42 Handle Assembly RF034100 070815 15 14 11 12 13 10 8 7 2 6 3 4 1 5 4 9 CLUTCH MODELS 3 ...
Страница 56: ...56 40 Deck Assembly ...
Страница 58: ...58 40 Dust Collection ...
Страница 60: ...60 40 Main Assembly ...
Страница 61: ...61 40 Main Assembly continued ...
Страница 62: ...62 Torsion Bar Adjustment ...
Страница 66: ......