CICLI PINARELLO S.R.L. | Viale della Repubblica, 12 - 31020 Villorba (TV) - Italia
C.F. - R.I. - P.IVA IT 05994100963 | tel. +39 0422 42 08 77 | fax +39 0422 42 18 16 | www.pinarello.com
43
11
. BRAKE CABLE INSTALLATION (INTEGRATED HANDLEBAR)
DISC & MECHANICAL
Steps that must be followed before:
6. DISC BRAKE: INSTALLATION AND HOSE ROUTING
8. MECHANICAL GROUPSET INSTALLATION
10. INTEGRATED HANDLEBAR (Talon ULTRA) ROUTING (Mechanical)
Follow steps 11.3.1 and 11.3.2 as before.
ATTENTION! The stem exit hole on the right-hand side the RB hose must be in front
of the FD housing.
ATTENTION! The stem exit hole on the left-hand side the FB hose must be in front of
the RD housing.
Follow steps 11.3.4, 11.3.5,11.3.6 as before.
11.4
RD
RB
FB
39
VIEW FROM BELOW!
11.1.4 The handlebar cable routing looks like this: