CICLI PINARELLO S.R.L. | Viale della Repubblica, 12 - 31020 Villorba (TV) - Italia
C.F. - R.I. - P.IVA IT 05994100963 | tel. +39 0422 42 08 77 | fax +39 0422 42 18 16 | www.pinarello.com
20
7.4
Battery installation (Shimano Di2):
- Install the battery into the seatpost using the battery hanger device. Make sure that
the battery is completely insert into the seat post, just the battery connector should
be outside.
ATTENTION! Battery hanger maximum torque: 2 Nm.
- Apply MOST Safe grip paste on the lower part of the seatpost to increase the friction
with the seat post pocket.
- Connect the 1000mm wire EW-SD50 to the battery.
- Insert the seatpost into the seat tube.
15
1000 mm
16
7
. ELECTRONIC GROUPSET (DI2) INSTALLATION AND CABLE ROUTING