PNOZ X9
Operating Manual PNOZ X9
19526-EN-09
11
Important for detection of shorts across contacts:
As this function for detecting shorts across contacts is not failsafe, it is tested by Pilz during
the final control check. If there is a danger of exceeding the cable runs, we recommend the
following test after the installation of the device:
1. Unit ready for operation (output contacts closed)
2. Short circuit the test terminals S12, S22 for detecting shorts across the inputs.
3. The unit's fuse must be triggered and the output contacts must open. Cable lengths in
the scale of the maximum length can delay the fuse triggering for up to 2 minutes.
4. Reset the fuse: remove the short circuit and switch off the supply voltage for approx. 1
minute.
Preparing for operation
Supply voltage
AC
DC
A1
A2
L1
N
FE
B1
B2
L+
L-
Input circuit
Single-channel
Dual-channel
E-STOP
without
detection of shorts across
contacts
S1
S22
S21
S11
S52
S12
S1
S11
S12
S52
S22
S21
E-STOP
with
detection of shorts across
contacts
S1
S22
S21
S12
S11
S52
S11
Safety gate
without
detection of shorts across
contacts
S1
S22
S21
S11
S52
S12
S1
S2
S22
S21
S11
S12
S52
Safety gate
with
detection of shorts across
contacts