
PSEN opII3F Series
Operating Manual PSEN opII3F Series
1003504-EN-01
31
}
Connection to other evaluation devices
–
Use the order reference of the cable listed (see
Accessories, connection to other
evaluation devices [
54]
)
–
The clamps for connection to the evaluation device must be kept in a locked control
cabinet. This prevents unauthorised modifications.
}
Ensure compliance with permissible cable bending radii (see
Technical
details [
42]
).
Connector pin assignment
Transmitter and receiver electrical connections are made with M12 connectors. These con-
nectors are located on the bottom of the transmitters and receivers.
}
Ensure that the wiring has been performed as indicated. Pins 1
and
5 must be connec-
ted to 24 V DC, otherwise, the correct functionality is not guaranteed.
5-pin connector on the transmit-
ter
PIN
Assignment
Cable colour
1
2
3
4
5
1
+24 VDC
brown
2
reserved
white
3
0 VDC
blue
4
reserved
black
5
+24 VDC
grey
5-pin connector on the receiver
PIN
Assignment
Cable colour
1
2
3
4
5
1
+24 VDC
brown
2
OSSD 1
white
3
0 VDC
blue
4
OSSD 2
black
5
+24 VDC
grey
Earthing the safety light grid
Please note:
}
Connect the 0 V connections on all the 24 V power supplies and earth the 0 V mains at
a single point, or ensure that measures are in place to monitor for earth faults.
}
The connection of the 0 V supply to the central earth bar or earth fault monitor must be
in accordance with relevant national regulations (such as EN 60204-1, NFPA 79:17-7,
NEC: Article 250).
}
Connections should be protected from corrosion.
}
Flexible earthing straps should be used on moving earth parts (e.g. machine parts,
gates). Ensure these earthing straps are as short and wide as possible.