background image

2

Introduction

Welcome

T

HE Evo series from Pike Signals

 delivers a breakthrough 

in combined vehicle and pedestrian phase control within 

portable systems. Drawing upon our long history within vehicle 
control dating back to 1932 and particularly our pioneering work 
with high-reliability radio-linked computerised systems, the Evo 
series is so named because it represents a natural, yet hard 
fought evolution to be the best. The best for reliability, the best for 
flexibility and the best for safety.
Evo series controllers provide great flexibility, adherence to four 
Highways Agency specifications (TR 2502B, TR2503B, TR 2537A 
and TR 2538A) and a compact size that allows their use in most 
Pike Signals housings. 
The Evo series is centred around a range of controllers, which 
can support up to nine vehicle phases and can operate as 
master or slave. This means that with a fleet of Evo controllers 
you will be able to configure the equipment in any order, 
maximising utilisation.
The Evo series provides vehicle control, vehicle control with 
pedestrian facilities and pedestrian only control. Using the PT5 
controller as a Master provides up to five vehicle phases and a 
pedestrian facility with up to four crossing points.
To ensure that no job is too large for the Evo series, the PT4 
expansion controller connects directly to the PT5 and raises the 
maximum capabilities of the system to nine vehicle phases and a 
further four pedestrian crossing points.   

Important

This system should be installed and operated only by fully 
trained and experienced personnel. The junction layout 
examples given in this document are for guidance only. 
Always consult your supervisor if you are in any doubt 
about correct procedures or if you are concerned about 
safety. Equipment must only be repaired by Pike Signals 
Ltd or authorised repair agents.

Caution

RISK OF EXPLOSION IF BATTERY IS REPLACED BY AN 
INCORRECT TYPE.
DISPOSE OF USED BATTERIES ACCORDING TO THE 
INSTRUCTIONS. 
Further important details about battery disconnection, 
handling and disposal can be found in the Operator’s 
guide for the signal unit within which the controller is 
installed.   

Содержание Evolution PT4+

Страница 1: ...ator s guide PSL2021 issue 2 rev a T5 PT5 PT4 This guide covers Evo T5 PT5 and PT4 controllers in their standard dual channel plus newer MULTI channel versions Please see page 13 for important informa...

Страница 2: ......

Страница 3: ...Making adjustments 15 Operation modes 16 Communication failures 16 Calling hold all red 17 Checking battery charge levels 18 Resetting the system 18 Decommissioning the system 19 Incidents during oper...

Страница 4: ...lisation The Evo series provides vehicle control vehicle control with pedestrian facilities and pedestrian only control Using the PT5 controller as a Master provides up to five vehicle phases and a pe...

Страница 5: ...l items needed to configure and monitor in master mode up to four separate pedestrian crossings see page 10 Phase MODE DEMAND When setting up as master determines the signal head configuration e g sin...

Страница 6: ...Evo PT5 shown on the previous page except for the pedestrian crossing functions Evo PT4 The Evo PT4 companion controller can be linked to any Evo PT5 to add a further four vehicle phases plus another...

Страница 7: ...f vehicle actuated portable traffic signals the Pink Book Safety at street works and road works the Maroon Book Traffic signs regulations and general directions TSRGD Chapter 8 2 For each approach mea...

Страница 8: ...ler is introduced the system operation will automatically revert to an earlier HA Specification requirement which is limited to four vehicle phases and has no provision for pedestrian facilities Every...

Страница 9: ...isplay will show that it s waiting for the master Waiting Mimic showing that this will be the primary head Mimic showing that this will be the secondary head Next Repeat this procedure for all vehicle...

Страница 10: ...strian only method of setup shown on page 12 Setting the master cont Switching on 1 Press POWER to switch on The text display will briefly show PIKE SIGNALS and then If a tactile indicator on a pedest...

Страница 11: ...hase until the required setting is illuminated selects one approach one head per approach selects one approach two heads per approach selects two approaches one head per approach aka two opposed heads...

Страница 12: ...destrian to walk the whole of the crossing The CLEARANCE setting allows you to determine an additional safety factor 4 seconds is the usual setting Next If you need to alter vehicle settings go to pag...

Страница 13: ...the master cont Starting operation Once the following stages are complete All heads signs and cones placed in appropriate locations Vehicle slave controllers set Pedestrian slave controllers set if us...

Страница 14: ...ns It is possible to use the LINK buttons to join vehicle phases in PEDESTRIAN ONLY mode however all linked signal heads MUST face in the same direction 4 Press RUN to begin Operation will start as fo...

Страница 15: ...he scan option 1 Press POWER to switch on The text display will show Radio Channel xx where xx is the last channel used 2 Press to advance to channel 17 and then press once more to show Radio Chan SCA...

Страница 16: ...the nearest Evo controller in the second set has its Tx power reduced so that it does not reach the closest unit s in the first set In reducing Tx power care must be taken that the unit with reduced...

Страница 17: ...ted approach es in small steps 1 Ensure that the ALL RED indicator is on If it is not press the MAX GRN ALL RED button located in the centre of the panel 2 Press the phase timing button for the phase...

Страница 18: ...all signals will switch off unless the master controller is running in HOLD ALL RED or MANUAL modes in which case all signals will remain at red The text display on the master controller will show th...

Страница 19: ...peration will remain halted with all signals at red until you restart it To resume operation press ALL RED Calling hold all red The system allows the hold all red mode to be invoked either from the Ev...

Страница 20: ...r all new slaves 3 When all affected heads have been reset on the master controller press the RUN button to restart operation Monitor the system operation until you are sure that it is working correct...

Страница 21: ...system When the portable signals are no longer required please follow this procedure to decommission their use To decommission the system 1 Ensure that the shuttle lanes are cleared of obstructions w...

Страница 22: ...tion On the master controller the text display will show Stopped and the mimic indicators representing the failed red signals will flash See Resetting the system on page 18 Red pedestrian signal failu...

Страница 23: ...y is below 11 5v the text display will show Low Battery and the controller will refuse to operate During operation when there are roughly two hours of operational time remaining within a remote signal...

Страница 24: ...ration incompatible with XL2 slaves Config Error 10 Master has unconfigured vehicle head Config Error 11 Master has unconfigured pedestrian head Config Error 12 A slave has unconfigured pedestrian hea...

Страница 25: ...on page 18 The Comms indicator is not flashing There is a communication error See Error indications on page 21 The text display is displaying a code See page 22 for a list of all display codes Battery...

Страница 26: ...t failure subject to fair wear and tear correct operation and return to our works carriage paid We undertake to repair or replace this equipment free of charge providing It has been maintained in good...

Страница 27: ...parate and recycle 5 1 Main controller board FR 4 glass epoxy with electronic components Separate and recycle 6 1 Communications board FR 4 glass epoxy with electronic components Separate and recycle...

Страница 28: ...ese two key settings determine how many crossings are to be used and whether Pedestrian Only mode is used see page 12 Slave signal head identities Each slave must be given an appropriate identity to m...

Страница 29: ...ageway controlled by two single approach phases each with one signal head Master phase modes Note All junction layout examples given in this document are meant for rough guidance only Please refer to...

Страница 30: ...ments for any particular junction types Example 2 Standalone pedestrian crossing 2 vehicle phases 2 approaches 1 head per approach with single pedestrian crossing This example shows a basic pedestrian...

Страница 31: ...used on a faster road with extra vehicle signals for added visibility and uses the PEDESTRIAN ONLY mode to use the most appropriate settings Note When the PEDESTRIAN ONLY mode is invoked all active p...

Страница 32: ...ch with single pedestrian crossing This example shows a pedestrian crossing combined with shuttle working Note All junction layout examples given in this document are meant for rough guidance only Ple...

Страница 33: ...e PEDESTRIAN ONLY mode to use the most appropriate settings Note When the PEDESTRIAN ONLY mode is invoked all active phases operate as one Master phase modes Note All junction layout examples given in...

Страница 34: ...h two vehicle linked phases and four pedestrian crossings Master phase modes Note All junction layout examples given in this document are meant for rough guidance only Please refer to Highways Agency...

Страница 35: ...ntrolled by four vehicle phases with four pedestrian crossings Master phase modes Note All junction layout examples given in this document are meant for rough guidance only Please refer to Highways Ag...

Страница 36: ...rolled using all five vehicle phases as well as four pedestrian crossings Master phase modes Note All junction layout examples given in this document are meant for rough guidance only Please refer to...

Страница 37: ...le working on a fast carriageway with a side road Master phase modes Note All junction layout examples given in this document are meant for rough guidance only Please refer to Highways Agency specific...

Страница 38: ......

Страница 39: ......

Страница 40: ...Pike Signals Limited Units 7 9 11 Phoenix Business Park Avenue Road Aston Birmingham B7 4NU tel 44 0 121 359 4034 fax 44 0 121 333 3167 email enquiries pikesignals com www pikesignals com...

Отзывы: