background image

 

 

 

1.3 HS1.  

The HS1 is manufactured from a high performance Aluminium 7075 alloy. PZT actuators 
are  preloaded  within  the  HS1  and  supply  the  driving  force  for  stage  movement.  The 
flexure hinges, which form the guidance mechanism, are cut into the stage using electric 
discharge machining (EDM). The PZT actuators are oriented parallel to the stage motion 
direction. There are no serviceable parts in the HS1 stage.  

 

A  stage  direction  arrow  is  located  on  the  side  of  the  stage.  This  arrow  indicates  which 
direction the stage moves when a positive voltage is applied. For XY or XYZ systems, an 
identification  label  of  either  X  (CHANNEL  1)  or  Y  (CHANNEL  2)  or  Z  (CHANNEL  3)  is 
located near the direction arrow. This identification, X, Y or Z, describes which driver axis 
that particular stage should be connected to.  

2  INSTALLATION 

The  HS1  may  be  installed  either  vertically  or  horizontally.  When  installed  vertically  the 
stage  direction  arrow  should  be  pointing  upward.  Larger  loads  may  be  carried  when 
mounted in the horizontal direction. It is always advisable to minimize the load carried by 
the  Nanopositioning  stage.  Heavier  loads  reduce  the  stage  response  time  and  may 
cause fatigue and /or reduced motion.  

2.1  Installing a single axis HS1 unit.  

To install a single axis HS1 use the following steps.  

  On  the  surface  that  the  HS1  is  to  be  mounted  on,  tap  M3  holes  on  a 

52,50X52,50mm square. 

  Make sure the surface to be mounted to is clean, flat, and free of burs.  

  Using  a  lint  free  cloth,  gently  wipe  off  the  bottom  of  the  HS1  to  remove  any 

particles or dust.  

  Use  M3  Socket  screws  to  secure  the  stage.  Use  a  maximum  torque  of  0.5  Nm. 

Attempt  to  minimize  the  torque  between  the  moving  and  fixed  part  of  the  stage 
during tightening.  

 
 

 

IMPORTANT! 

Check for ground loops (

Section 3

) between the  HS1 and the mounting 

surface.  
 
Items can be attached to the scanning stage using one or more of the  M2.5 holes that 
are tapped on the moving part of the stage. These M2.5 holes are on a 29mm square. To 
attach an item to the scanning stage, use the following procedure.  

  Using a lint free cloth, gently wipe off the top of the HS1 to remove any particles 

or dust.  

  Make sure the item to be attached is flat and free of particles or dust.  

  Locate the item to be attached and ensure that it does not come into contact with 

any portion of the stage other than the moving portion. Ensure that the item being 
attached does not come into physical contact with any other item.  

  Tighten the M2.5 screws, using a maximum torque of 0.5 Nm. Attempt to minimize 

the torque between the moving part and fixed part of the stage during tightening.  

 

Содержание HS1

Страница 1: ...1 INSTALLATION AND OPERATION MANUAL HS1 PIEZOCONCEPT 15 Rue du Bocage 69008 LYON France ...

Страница 2: ...om the PIEZOCONCEPT controller first set the command voltage to 0 0V then turn the AC power to the PIEZOCONCEPT controller off and finally wait one minute before disconnecting The HS1 has no user serviceable parts Only trained service personnel should perform service IMPORTANT All Technical Information recommendations and examples related to PIEZOCONCEPT Products made in this manual are based on i...

Страница 3: ...ATION 5 2 1 Installing a single axis HS1 unit 5 2 2 Installing a two axis HS1 unit 6 2 3 Installing a three axis HS1 unit 6 3 GROUND LOOPS 7 3 1 Prevention and identification of ground loops 7 4 OPERATING THE NANOPOSITIONING STAGE 7 4 1 Operating in closed loop mode 7 4 2 Care during operation 8 ...

Страница 4: ...cientific instrument and therefore requires special handling in order to ensure proper operation Mishandling can cause permanent damage to the nanopositioning stage To ensure a long and useful life the following guidelines should be strictly followed Never insert anything into the EDM grooves The EDM grooves are the cuts that form the flexure hinges and separate the moving portion of the stage Do ...

Страница 5: ... 2 1 Installing a single axis HS1 unit To install a single axis HS1 use the following steps On the surface that the HS1 is to be mounted on tap M3 holes on a 52 50X52 50mm square Make sure the surface to be mounted to is clean flat and free of burs Using a lint free cloth gently wipe off the bottom of the HS1 to remove any particles or dust Use M3 Socket screws to secure the stage Use a maximum to...

Страница 6: ...t head screws Do not hold on to the bottom or Y axis while loosening To install a two axis HS1 system use the following steps 1 Install the first or bottom HS1 Y axis using the procedures described above in Section 2 1 2 Using a lint free cloth gently wipe off the top of the installed HS1 and the bottom of the adapter plate to remove any particles or dust 3 Using four M2 5 screws provided bolt the...

Страница 7: ...ews and the mounting surface may short circuit the ground loop In a few cases this may not be an effective method When this occurs please identify high current sources returning to ground through your mounting surface Mounting surfaces should never be used as the electrical ground current path for any instrumentation such as vacuum pumps computers etc Should you observe unexpected oscillations in ...

Страница 8: ...ow 1 minute for the PZT actuators to discharge before disconnecting For more information see the PIEZOCONCEPT CONTROLLER OPERATION MANUAL 4 2 Care during operation The HS1 is a high precision scientific instrument and should be handled with care during operation Failure to do so may result in permanent damage During operation ensure that there are no physical constraints on the moving stage or any...

Отзывы: