![Pichler LG 1000 Скачать руководство пользователя страница 41](http://html1.mh-extra.com/html/pichler/lg-1000/lg-1000_operating-and-installation-instructions_1554901041.webp)
Condensat e connection DN 32 mm
8
.2
Unit installation – free-standing installation
The
Safety notes
under
Section 3.2
of this Manual must be heeded at all times when performing
any work!
The ventilation unit will be supplied as parts. Sufficient space must be allowed for fitting of air duct
connections, electrical connections and the condensate connection and for maintenance and
inspections.
After placing the unit in its position, it must be aligned.
To guarantee good discharge of condensate, ensure adequate space
between floor and underside of the unit.
8
.2.1 Making the condensate water connection
Cut the siphon to length and connect to the valve
connection on the inspection side of the
condensate tray.
An adequate gradient (at least 5%) is required for
reliable draining of water. Fill the siphon with water
to effectively block odours and avoid leakage.
We recommend using a ball siphon, since
all
ventilation units operate at under
pressure
For exterior installations the siphon should
beequipped with trace heating on site.
O P E R A T I N G A N D I N S T A L L A T I O N I N S T R U C T I O N S L G
7 5 0 - L G 6 0 0 0
P A G E 4
1