
5 Installation
P-2x5 Piezo Actuator
PZ245E
Version: 1.1.1
25
5.5
Fixing the Load
Requirements
You have read and understood the general notes on installing (p. 19).
The P-2x5 is discharged (p. 34) and short-circuited by the shorting plug (p. 12) provided.
Tools and accessories
M8 screw of suitable length; see "Dimensions" (p. 45)
Suitable screwdriver
Open-end wrench for holding the tip of the P-2x5 (p. 10) in place:
−
P-225: AF 13
−
P-235: AF 17
Fixing the load
1.
Use an open-end wrench with a matching jaw size to hold the tip of the P-2x5 in place.
2.
Fasten the load to the mounting hole in the tip with an M8 screw; see "Dimensions"
(p. 45).
3.
Remove the open-end wrench from the tip.
5.6
Optional: Connecting the Purge Air
NOTICE
Destruction of the piezo actuator by cooling too quickly!
If the cooling is too fast, the resulting thermomechanical load can destroy the piezo actuator.
Only connect the purge air to the piezo actuator when the piezo actuator has cooled down
to room temperature.
INFORMATION
The piezo actuator can be cooled with purge air when the P-2x5 has been ordered with the
option "PT1000 temperature sensor and purge air connector for PICA high-voltage piezo
actuators" (P-177.50) (p. 13).