
5 Installation
24
Version: 1.2
MP106E
M-235 Linear Actuators
Figure 7: Clamp connection (schematic)
1
Mechanical mounting
2
Sleeve
3
Mounting nut, M20
4
Mounting shaft with thread
5
Pusher with end piece (flat)
We recommend installing the actuator in the mechanical mounting with a clamp
connection. The following instructions refer to this case.
Prerequisites
You have read and understood the General Notes on Installation (p. 17).
You have provided your application with a suitable mounting for the mounting
shaft of the actuator (p. 21).
Tools and accessories
Open-end wrench SW 24
Installing the actuator
1. Loosen the mounting nut on the mounting shaft of the actuator.
2. Position the actuator in the mounting of your application.
3. If necessary, stick a suitable flat washer or a suitable spring washer on the
mounting shaft.