
User Manual
Turnaround Sheave
108-3108-HV0
108-3108-HV1
OPS-3108 Rev E
14
5 Maintenance
All maintenance to be carried out by suitably qualified and competent
personnel
5.1 Introduction
Regular maintenance of the equipment using Phuel redress kits or Phuel
approved parts is essential to its continued safe operation. Ensure that the pre
and post job operating procedures are followed and that maintenance records
are kept.
5.2 Schedule
The maintenance schedule may be governed by international or company
standards and the following are considered to be the minimum requirements.
5.2.1 Pre & Post Job
Refer to Section 4.1 and Section 4.3 for details
5.2.2 Yearly
•
Disassemble Turnaround Sheave (see Figure 4: Assembly &
Disassembly Instructions) clean and degrease all components
•
Inspect the condition of all sealing surfaces and surface coatings. If in
doubt contact Phuel Oil Tools Ltd for advice
•
Re-lubricate threads and sealing surfaces.
•
Replace all elastomeric seals with items from redress kit (see spares
Section 8)
•
Re-grease components
•
Re-assemble (see Figure 4: Assembly & Disassembly Instructions)
•
Pressure test to maximum working pressure in accordance to testing
procedure (see Para 6)
•
Inspect paint work and repair as necessary
5.2.3 Five Yearly
•
Yearly Maintenance (plus the following)
•
Carry out 100% surface NDE on all surfaces
•
Pressure test to test pressure witnessed by verifying body
•
Repaint
Содержание 108-3108-HV0
Страница 22: ...OPS 3108 Rev E 21 Figure 6 Turnaround Sheave Assembly...
Страница 23: ...OPS 3108 Rev E 22 Figure 7 Alternative Wheel Part Nos...
Страница 24: ...OPS 3108 Rev E 23 Figure 8 Handling Kit...
Страница 34: ...User Manual Turnaround Sheave 108 3108 HV0 108 3108 HV1 OPS 3108 Rev E C 2 Operation...