Phuel 108-3108-HV0 Скачать руководство пользователя страница 11

 

User Manual 

Turnaround Sheave 

108-3108-HV0 
108-3108-HV1 

 

OPS-3108 Rev E 

 

10 

4  Operation 

All  operations  to  be  carried  out  by  suitably  qualified  and  competent 
personnel 

4.1  Pre Job 

  Confirm identification information plate is fitted and correct  

  Check maintenance record sheet and ensure the equipment has been 

maintained by competent personnel 

  Check all certification is in date 

  Ensure equipment is suitable for the maximum working pressures and 

services involved 

  Ensure threads are clean 

  Inspect for signs of damage 

  Fill turnaround Sheave with clean grease 

  If using the Phuel Detection System Insert a length of wire and confirm 

that the wheel is moving freely. (See Section 6). 

  Pressure test to the maximum operating pressure 

  Ensure all connections are tight 

  Ensure correct Pulley Wheel for the wire being used is fitted 

  To  avoid  tilting  during  lifts  it  is  recommended  that  2  lifting  points  are 

used to lift the equipment into place 

4.2  During Job 

  Using suitable pump fill TAS with clean grease 

  Secure the TAS to the mast to prevent excessive movement 

  Use  the  sensor  to  show  that  the  wheel  is  turning  as  expected.  If  not 

using  Detection  System  rotation  is  indicated  by  the  difference  in  the 
Up/Down weights while spooling wire 

  Ensure  that  grease  is  always  being  pumped  from  the  inside  of  the 

bearings outwards to the well adjust so that pump maintains a stroke of 
1 – 2 strokes per minute. 

  Bleed off any build up of gas at the top of the wheel if required 

4.3  Post Job 

  Inspect for signs of damage and report any findings 

  Ensure threads are cleaned and the re-greased 

  Pump through with clean grease ensuring that there is no pressure lock 

and check that the wheel turns freely 

  If debris is found in the system a full strip and rebuild is required 

  Fit protectors to retain the grease fit sensor protector 

Содержание 108-3108-HV0

Страница 1: ...OPS 3108 Rev E Unit 17 Denmore Industrial Estate Denmore Road Bridge of Don Aberdeen AB23 8JW User Manual Turnaround Sheave 108 3108 HV0 HV1...

Страница 2: ...ication 5 Table 2 Maintenance Record 16 Table 3 Part List for 108 3108 HV0 18 Table 4 Parts List for 108 3108 HV1 19 Table 5 Parts List for 108 4131 HV0 20 Table 6 Part List for Handling Kit 108 3508...

Страница 3: ...Revision History Issue Release Date Description Rev A 24 April 2010 Initial Issue Rev B 22 June 2010 Fitting Tool Catcher Added Rev C 13 June 2011 Tool Catcher Adaptor Assembly Added Rev D 17 Jan 2014...

Страница 4: ...n that may cause its working pressure to be exceeded All personnel involved in pressure testing must be formally trained competent and utilise the appropriate PPE Ensure the identification plate is fi...

Страница 5: ...nd maintenance instructions parts list and drawings 1 2 Product Identification Phuel products are identified by a unique serial number that facilitates full product traceability Each product is suppli...

Страница 6: ...ensor Housing P3 or Blank Maximum Working Pressure 10 000 Psi 690 bar Maximum Test Pressure 15 000 Psi 1035 bar Safe Lifting Load 6 1 2 Ton Weight 876 lbs 398 Kg 108 3108 HV0 847 lbs 385 Kg 108 3108 H...

Страница 7: ...User Manual Turnaround Sheave 108 3108 HV0 108 3108 HV1 OPS 3108 Rev E 6 Figure 2 Specification drawing dimensions in inches...

Страница 8: ...User Manual Turnaround Sheave 108 3108 HV0 108 3108 HV1 OPS 3108 Rev E 7 Figure 3 Specification drawing dimensions in mm...

Страница 9: ...1 2008 and is registered with BSI Certificate No FS 511512 OPS 3108 Rev E 8 Part Number 108 3108 HV0 Description 20 TAS 5 3 4 10K Working Pressure N A Temperature 18 C TO 121 C Pad eye SWL 6 5 TONNE 6...

Страница 10: ...s are attached to make the handling and stabbing in process easier An alternative Bottom Sub can be provided to allow the Phuel IRIS tool catcher to be directly incorporated without wasting more riser...

Страница 11: ...ng used is fitted To avoid tilting during lifts it is recommended that 2 lifting points are used to lift the equipment into place 4 2 During Job Using suitable pump fill TAS with clean grease Secure t...

Страница 12: ...ling Kit to remove the Seal Ring Ensure that the internal volume is open to atmosphere to avoid creating a vacuum Tip Tighten the screws a little amount each time ensuring that they are all being exte...

Страница 13: ...ded equally Replace the Inner and Outer Plates and secure with the screws and Nordloc washers Tip Position the Plates so that the four tapped holes in the Seal Ring are not covered This ensures that t...

Страница 14: ...daptor to the Turnaround Sheave if not already fitted Split Tool Catcher down removing the Top Sub Finger Hub and top fingers Shock Absorber and Spacer Spring Refer to relevant Tool Catcher manual for...

Страница 15: ...Job Refer to Section 4 1 and Section 4 3 for details 5 2 2 Yearly Disassemble Turnaround Sheave see Figure 4 Assembly Disassembly Instructions clean and degrease all components Inspect the condition o...

Страница 16: ...User Manual Turnaround Sheave 108 3108 HV0 108 3108 HV1 OPS 3108 Rev E 15 Figure 4 Assembly Disassembly Instructions...

Страница 17: ...User Manual Turnaround Sheave 108 3108 HV0 108 3108 HV1 OPS 3108 Rev E 16 5 3 Maintenance Record Sheet Date Performed Type of Maintenance Performed By Verified By Comments Table 2 Maintenance Record...

Страница 18: ...a minimum of 5 minutes Bleed pressure off Increase pressure to Maximum Working Pressure allow to stabilise maintain this pressure for 5 minutes and bleed off then re pressurise to Maximum Working Pres...

Страница 19: ...3373 STL 2 THIN ROLLER BEARING KAYDON KF180XP0 13 190 1758 416 1 AFO Plug PLAA3124010A 14 801 0387 H90 1 O Ring B S Size 387 15 801 0389 H90 1 O Ring B S Size 389 16 801 3437 GRF 1 BACK UP RING TO SU...

Страница 20: ...THIN ROLLER BEARING KAYDON KF180XP0 13 190 1758 416 1 AFO Plug PLAA3124010A 14 801 0387 H90 1 O Ring B S Size 387 15 801 0389 H90 1 O Ring B S Size 389 16 801 3437 GRF 1 BACK UP RING TO SUIT 387 17 80...

Страница 21: ...1 ADAPTER PROTECTOR 6 250 6 ACME Table 5 Parts List for 108 4131 HV0 Figure 5 Tool Catcher Adapter Assembly Item Number Part Number Quantity Description 1 108 3499 STL 4 JACK PLATE 2 108 3511 STL 3 J...

Страница 22: ...OPS 3108 Rev E 21 Figure 6 Turnaround Sheave Assembly...

Страница 23: ...OPS 3108 Rev E 22 Figure 7 Alternative Wheel Part Nos...

Страница 24: ...OPS 3108 Rev E 23 Figure 8 Handling Kit...

Страница 25: ...HV0 Part No Qty Description 801 0387 H90 1 O Ring B S Size 387 801 0389 H90 1 O Ring B S Size 389 801 3437 GRF 1 Back Up Ring to suit 387 801 3436 GRF 1 Back Up Ring to suit 389 801 0119 V90 3 O Ring...

Страница 26: ...ng with the buckling stresses Internal pressure will not be considered as even low pressures will create a significant tensile force that will counteract the effect of the riser weight and any applied...

Страница 27: ...08 Rev E A 2 Typical Equipment Arrangement For discussion purposes the diagram below shows the typical arrangement of the equipment for braided and slickline operations Figure 9 Typical Hook Up Arrang...

Страница 28: ...a a F f f F f Since we are dealing with bending in a single plane b by bx f f f 2 2 The allowable axial compressive stress Fa is determined from the following assuming that 60 t D c c c y c a C r Kl...

Страница 29: ...ia about the axis of bending 4 4 64 ID OD And A Cross section Area 2 2 4 ID OD For the riser section the OD 6 970 in minimum and the ID 5 145 in maximum Therefore I 81 46 in4 and A 17 4 sqin so r 2 16...

Страница 30: ...15 0 13 3 12 0 10 9 10 0 9 2 100 29 8 22 4 18 4 15 7 13 8 12 4 11 2 10 3 9 4 300 28 0 21 3 17 6 15 2 13 4 12 0 10 9 9 9 500 26 5 20 4 16 9 14 6 12 9 11 6 10 5 700 25 2 19 6 16 3 14 1 12 5 11 2 1000 27...

Страница 31: ...ssembly 3 Ensure parts are aligned when stabbing into seals 4 Pressure Test Leaking Fittings 1 Tighten fitting to try and halt leak 2 If still leaking remove fitting clean with a wire brush and re tap...

Страница 32: ...internal pressure test has been applied after assembly 2 Strip down and investigate Consult Agent for advise During Operations Confirmed with sensor Confirm with high up weight versus down weight Deb...

Страница 33: ...ecifically designed to allows the lower sheave to be mounted to the lubricator and ensure that the wire runs into the greasehead correctly It is designed to interface with a WTi style lower sheave wit...

Страница 34: ...User Manual Turnaround Sheave 108 3108 HV0 108 3108 HV1 OPS 3108 Rev E C 2 Operation...

Отзывы: