HD7853/60 /61 /62
5-11
Automatic fi lling procedure:
The Senseo PCB contains an automatic fi lling procedure
software routine.
This fi ll routine is only meant for
back-up
.
Normally the consumer has to follow the guidelines stated in
the DFU.
The fi lling procedure functions as follows:
The consumer has to fi ll the water container and has to plug
the appliance on the mains.
When the Senseo main switch has been pushed the main
switch led, one- and two cup led will light continuously.
This is only the case when the Senseo has not fi nished the
fi lling procedure completely! (
First use
)
This can be checked by reconnect the power cord a second
time to the net and check if the main switch LED will blink
very rapidly for approximately 1 second.
When the consumer pushes the one or two-cup button, the
Senseo will start automatically the pump to fi ll the boiler and
after that the Steam heater will also be fi lled.
When the water container is empty the fi lling procedure is
fi nshed.
When the fi lling procedure has been successful the software
will clear a
Boiler_empty_fl ag
in the Eeprom.
By means of this
Boiler_empty_fl ag
the system knows the
boiler is fi lled or not!
When the Senseo is switched off or disconnected from the
mains, the value of the
Boiler_empty_fl ag
is stored in the
Eeprom chip.
Restoring the Boiler_empty_fl ag to production
default:
Some times it is needed that the boiler of the Senseo have to
be emptied.
This for instance in wintertime were the possibility exists that
the boiler becomes frozen during transport e.g.
For those occasions it is handy to restore the
Boiler_
empty_fl ag
again to production default in the Eeprom.
Bringing the Senseo back into production status, has the
benefi t the fl ush routine will be activated automatically when
installed by the consumer, see topic
Automatic fi lling
procedure
.
To
SET
the
Boiler_empty_fl ag
can be done by:
Keep the 1-cup button pressed while plugging in the
power cord of the appliance
.
The main switch LED will blink very rapidly for approximately
1 second.
To check if the
Boiler_empty_fl ag
is really set, you should
reconnect the power cord a second time to the net and
check if the main switch LED will blink very rapidly for
approximately 1 second.
REPAIR INSTRUCTION
Содержание HD7853/60
Страница 7: ...HD7853 60 61 62 7 11 2 5 6 7 3 1 9 8 4 EXPLODEDVIEW ...
Страница 8: ...HD7853 60 61 62 8 11 g h 11 10 12 13 14 15 EXPLODEDVIEW ...
Страница 10: ...HD7853 60 61 62 10 11 c d e Y X W W V U T S 41 40 42 43 44 45 y 39 35 38 37 36 EXPLODEDVIEW ...
Страница 11: ...HD7853 60 61 62 11 11 bb cc dd k p l m n ee o gg ll hh kk jj ii aa ff 49 48 46 46 47 EXPLODEDVIEW ...