1-2-2
BDP_ISP
Safety Check after Servicing
Examine the area surrounding the repaired location
for damage or deterioration. Observe that screws,
parts, and wires have been returned to their original
positions. Afterwards, do the following tests and con-
firm the specified values to verify compliance with
safety standards.
1. Clearance Distance
When replacing primary circuit components, confirm
specified clearance distance (d) and (d’) between sol-
dered terminals, and between terminals and surround-
ing metallic parts. (See Fig. 1)
Table 1 : Ratings for selected area
Note:
This table is unofficial and for reference only.
Be sure to confirm the precise values.
2. Leakage Current Test
Confirm the specified (or lower) leakage current
between B (earth ground, power cord plug prongs)
and externally exposed accessible parts (RF termi-
nals, antenna terminals, video and audio input and
output terminals, microphone jacks, earphone jacks,
etc.) is lower than or equal to the specified value in the
table below.
Measuring Method (Power ON) :
Insert load Z between B (earth ground, power cord
plug prongs) and exposed accessible parts. Use an
AC voltmeter to measure across the terminals of load
Z. See Fig. 2 and the following table.
AC Line Voltage
Clearance Distance (d), (d’)
230 V
≥
3 mm(d)
≥
6 mm(d’)
Fig. 1
Chassis or Secondary Conductor
Primary Circuit
d'
d
AC Voltmeter
(High Impedance)
Exposed Accessible Part
B
One side of
Power Cord Plug Prongs
Z
Fig. 2
Table 2: Leakage current ratings for selected areas
Note:
This table is unofficial and for reference only. Be sure to confirm the precise values.
AC Line Voltage
Load Z
Leakage Current (i)
One side of power cord plug
prongs (B) to:
230 V
2k
Ω
RES.
Connected in
parallel
i
≤
0.7mA AC Peak
i
≤
2mA DC
RF or
Antenna terminals
50k
Ω
RES.
Connected in
parallel
i
≤
0.7mA AC Peak
i
≤
2mA DC
A/V Input, Output
Содержание BDP7200/12
Страница 10: ...1 4 1 E5J10IB OPERATING CONTROLS AND FUNCTIONS ...
Страница 11: ...1 4 2 E5J10IB ...
Страница 40: ...AV CBA Top View BE5J10F01071A 1 11 9 ...
Страница 56: ...BE Main 9 10 Schematic Diagram E5J10SCBM9 SMD 1 11 25 ...
Страница 57: ...BE Main 10 10 Schematic Diagram E5J10SCBM10 SMD 1 11 26 ...
Страница 58: ...BE Main CBA Top View 1 11 27 BE5E00G08016 ...
Страница 59: ...BE Main CBA Bottom View 1 11 28 BE5E00G08016 ...
Страница 62: ...FE Main 3 5 Schematic Diagram E5J10SCFM3 1 11 31 SMD ...